Skip to content
Gridcensus

UNKNOWN115616

Substation-Adjacent

Shelby, Tennessee · SERC

DC Readiness
67.1
Good / 100

UNKNOWN115616 is a substation-adjacent datacenter candidate site in Shelby, Tennessee, interconnecting through SERC. It screens at 67.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN115616
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
UtilityCITY OF MEMPHIS - (TN)municipalfavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPLevel(3) Memphis
IXP distance1.7 mi
Fiber providers12
Fiber coverage57.7%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterLevel(3) Memphis
DC distance1.7 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.42¢/kWh
Industrial electricity11.95¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$5,264

Regulatory climate

Favorablestate posture · as of 2026-08

TVA territory, DC-friendly; fast vertically-integrated interconnection.

DC tax incentiveYes
Large-load threshold≥ 50 MW

TVA infrastructure-cost provisions apply to very large loads.

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN115616

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power20%
73
Fiber connectivity12%
90
Energy cost10%
50
Water risk7%
90
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
100
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
45

Nearby comparable sites

Other scored datacenter candidate sites in Shelby, ranked by DC Readiness.

Sites near UNKNOWN115616
SiteTypeVoltageCapacityQueue waitScore
CORDOVASubstation-Adjacent500 kV1,000 MW1.0 yrs74.0
OZ ShelbyGreenfield——3.7 yrs67.8
UNKNOWN115618Substation-Adjacent161 kV100 MW1.0 yrs67.2
EC Near AllenGreenfield——3.7 yrs67.1
UNKNOWN115413Substation-Adjacent161 kV100 MW1.0 yrs67.0
UNKNOWN115410Substation-Adjacent161 kV100 MW1.0 yrs66.9
UNKNOWN120788Substation-Adjacent161 kV100 MW1.0 yrs66.9
TAP154306Substation-Adjacent161 kV100 MW1.0 yrs66.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN115616, Shelby. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.