xAI Colossus
DatacenteractiveMemphis, TN · xAI
xAI Colossus is an operating datacenter facility in Memphis, TN, operated by xAI. It spans approximately 776,966 square feet. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Facility
Nearby internet exchanges
- EdgeConneX Memphis (EDCMEM01)Memphis, TN · 6 networks
- DataBank Memphis (MEM1)Memphis, TN · 5 networks
- Expedient MemphisMemphis, TN · 2 networks
- Level(3) MemphisMemphis, TN · 2 networks
Other datacenters nearby
- xAI Macrohard Colossus 2xAI · Memphis, TN
- xAI MacrohardrrxAI · Memphis, MS
- EdgeConneX Memphis (EDCMEM01)EdgeConneX Inc. · Memphis, TN
- xAI MacrohardrrxAI · Memphis, TN
- xAI ColossusxAI · Memphis, TN
Nearby datacenter candidate sites
Scored candidate sites near xAI Colossus, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| FREEPORT | Substation-Adjacent | MS | DeSoto County | 500 kV | 1,000 MW | 1.4 yrs | 78.6 |
| Allen | Brownfield | TN | Shelby | — | 990 MW | — | 76.6 |
| SOUTHAVEN | Substation-Adjacent | MS | DeSoto County | 500 kV | 1,000 MW | 1.4 yrs | 75.9 |
| SHELBY | Substation-Adjacent | TN | Tipton County | 500 kV | 1,000 MW | 1.4 yrs | 75.5 |
| HORN LAKE | Substation-Adjacent | MS | DeSoto County | 230 kV | 300 MW | 1.4 yrs | 74.3 |
| Greenfield (FREEPORT - CORDOVA) | Greenfield | TN | Shelby County | 500 kV | 1,000 MW | 1.4 yrs | 73.9 |
| Greenfield (FREEPORT - CORDOVA) | Greenfield | MS | DeSoto County | 500 kV | 1,000 MW | 1.4 yrs | 72.5 |
| UNKNOWN115615 | Substation-Adjacent | TN | Shelby County | 161 kV | 100 MW | 1.4 yrs | 72.3 |
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for xAI Colossus, Memphis, TN. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.