Open Computing Facility
DatacenteractiveCA
Open Computing Facility is an operating datacenter facility in CA.. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Facility
Nearby internet exchanges
- Hurricane Electric Fremont 2Fremont, CA · 304 networks
- Equinix SV8 - Silicon Valley, Palo AltoPalo Alto, CA · 68 networks
- CoreSite - San Jose (SV1)San Jose, CA · 56 networks
- Digital Realty SFO (200 Paul)San Francisco, CA · 45 networks
- Hurricane Electric Fremont 1Fremont, CA · 44 networks
Other datacenters nearby
- Hurricane Electric Fremont 2Hurricane Electric · CA
- Kaiser Data CenterCA
- Digital Realty Silicon Valley SJC37Digital Realty · CA
- Silicon Valley SJC31Digital Realty · CA
- Csquare SFO2Csquare · CA
Nearby datacenter candidate sites
Scored candidate sites near Open Computing Facility, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| MARTIN | Substation-Adjacent | CA | San Mateo County | 230 kV | 300 MW | 5.7 yrs | 63.4 |
| ROSSMOOR | Substation-Adjacent | CA | Contra Costa County | 230 kV | 300 MW | 5.7 yrs | 62.7 |
| CASTRO VALLEY | Substation-Adjacent | CA | Alameda County | 230 kV | 300 MW | 5.7 yrs | 62.4 |
| EMBARCADERO | Substation-Adjacent | CA | Contra Costa County | 230 kV | 300 MW | 5.7 yrs | 62.4 |
| POTRERO | Substation-Adjacent | CA | San Mateo County | 230 kV | 300 MW | 5.7 yrs | 62.1 |
| San Francisco Electric Reliability Proj | Brownfield | CA | Contra Costa | — | 152 MW | — | 61.9 |
| CASTRO VALLEY TAP | Substation-Adjacent | CA | Alameda County | 230 kV | 300 MW | 5.7 yrs | 61.8 |
| NEWARK | Substation-Adjacent | CA | Alameda County | 230 kV | 300 MW | 5.7 yrs | 61.8 |
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Open Computing Facility, CA. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.