Kaiser Data Center is an operating datacenter facility in CA. It spans approximately 162,791 square feet. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Facility
Nearby internet exchanges
- Digital Realty SFO (200 Paul)San Francisco, CA · 45 networks
- Digital Realty SFO (365 Main)San Francisco, CA · 36 networks
- Digital Realty OAK (720 2nd St)Oakland, CA · 6 networks
- Evocative Emeryville (EM1)Emeryville, CA · 3 networks
- 360 SpearSan Francisco, CA · 3 networks
Other datacenters nearby
- PG&E DatacenterFairfield, CA
- 365 Main Street Data CenterDigital Realty · CA
- 360 Spear Street Data CenterDigital Realty · San Francisco, CA
- e360Concord, CA
- Ntirety DCNtirety · San Francisco, CA
Nearby datacenter candidate sites
Scored candidate sites near Kaiser Data Center, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| ROSSMOOR | Substation-Adjacent | CA | Contra Costa County | 230 kV | 300 MW | 5.7 yrs | 62.7 |
| LAKEVILLE | Substation-Adjacent | CA | Marin County | 230 kV | 300 MW | 5.7 yrs | 61.6 |
| TIDEWATER | Substation-Adjacent | CA | Contra Costa County | 230 kV | 300 MW | 5.7 yrs | 61.4 |
| VACA-DIXON | Substation-Adjacent | CA | Solano County | 500 kV | 1,000 MW | 5.7 yrs | 61.2 |
| BAHIA | Substation-Adjacent | CA | Contra Costa County | 230 kV | 300 MW | 5.7 yrs | 60.4 |
| PARKWAY | Substation-Adjacent | CA | Solano County | 230 kV | 300 MW | 5.7 yrs | 60.1 |
| PEABODY | Substation-Adjacent | CA | Solano County | 230 kV | 300 MW | 5.7 yrs | 59.1 |
| ROSSMOOR TAP 2 | Substation-Adjacent | CA | Contra Costa County | 230 kV | 300 MW | 5.7 yrs | 59.0 |
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Kaiser Data Center, CA. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.