Meta Forest City datacenter
DatacenteractiveNC · Meta
Meta Forest City datacenter is an operating datacenter facility in NC, operated by Meta. It spans approximately 319,829 square feet. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Nearby internet exchanges
- DartPoints Spartanburg, SC - SPA1Spartanburg, SC · 4 networks
- DartPoints Greenville, SC - GSP1Greenville, SC · 3 networks
- DC BLOX GSP1 - DCBLOX GreenvilleGreenville, SC · 2 networks
- T5@CharlotteKings Mountain, NC · 0 networks
- CloudOgreMill Spring, NC · 0 networks
Other datacenters nearby
- Facebook Forest City Data CenterMeta · NC
- T5 Charlotte CampusT5 Data Centers · Kings Mountain, NC
- Meta Forest City datacenterMeta · NC
- Meta Forest City datacenterMeta · NC
- Apple MaidenApple · Maiden, NC
Nearby datacenter candidate sites
Scored candidate sites near Meta Forest City datacenter, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TIGER TIE | Substation-Adjacent | SC | Spartanburg County | 230 kV | 300 MW | 1.0 yrs | 67.2 |
| PEACH VALLEY TIE | Substation-Adjacent | SC | Spartanburg County | 230 kV | 300 MW | 1.0 yrs | 67.2 |
| OZ Spartanburg | Greenfield | SC | Spartanburg | — | — | 3.7 yrs | 66.8 |
| RIPP SWITCHING STATION | Substation-Adjacent | SC | Cherokee County | 230 kV | 300 MW | 1.0 yrs | 66.1 |
| UNKNOWN111316 | Substation-Adjacent | NC | Cleveland County | 500 kV | 1,000 MW | 3.8 yrs | 65.8 |
| RIVERVIEW SWITCHING STATION | Substation-Adjacent | SC | Cherokee County | 230 kV | 300 MW | 1.0 yrs | 63.4 |
| UNKNOWN114398 | Substation-Adjacent | SC | Spartanburg County | 100 kV | 50 MW | 1.0 yrs | 63.3 |
| UNKNOWN114657 | Substation-Adjacent | SC | Spartanburg County | 100 kV | 50 MW | 1.0 yrs | 63.3 |
See something wrong or out of date?
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Meta Forest City datacenter, NC. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.