CyrusOne Quincy
DatacenteractiveWA · CyrusOne
CyrusOne Quincy is an operating datacenter facility in WA, operated by CyrusOne. It spans approximately 1,779,563 square feet. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Nearby internet exchanges
- Intergate.QuincyQuincy, WA · 4 networks
- Serverfarm TiTAN Moses LakeMoses Lake, WA · 2 networks
- H5 Data Centers QuincyQuincy, WA · 2 networks
- H5 Data Centers Quincy 2/3Quincy, WA · 0 networks
Other datacenters nearby
- Microsoft MWH Data CenterMicrosoft · WA
- Intergate Quincy Data CenterSabey Data Centers · WA
- NTTData Data CenterWA
- Intergate ColumbiaWA
- H5 Data CenterIntuit · WA
Nearby datacenter candidate sites
Scored candidate sites near CyrusOne Quincy, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| COLUMBIA | Substation-Adjacent | WA | Kittitas County | 500 kV | 1,000 MW | 1.7 yrs | 74.9 |
| UNKNOWN206104 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 1.7 yrs | 74.5 |
| TAP206102 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 1.7 yrs | 74.1 |
| UNKNOWN201377 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 1.7 yrs | 73.0 |
| TAP206103 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 1.7 yrs | 71.8 |
| Greenfield (GRAND COULEE 500KV - COLUMBIA) | Greenfield | WA | Grant County | 500 kV | 1,000 MW | 1.7 yrs | 71.3 |
| TAP206034 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 1.7 yrs | 70.8 |
| UNKNOWN209152 | Substation-Adjacent | WA | Grant County | 115 kV | 100 MW | 1.7 yrs | 70.8 |
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for CyrusOne Quincy, WA. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.