Microsoft MWH Data Center
DatacenteractiveWA · Microsoft
Microsoft MWH Data Center is an operating datacenter facility in WA, operated by Microsoft. It spans approximately 8,381,014 square feet. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Facility
Nearby internet exchanges
- Intergate.QuincyQuincy, WA · 4 networks
- Serverfarm TiTAN Moses LakeMoses Lake, WA · 2 networks
- H5 Data Centers QuincyQuincy, WA · 2 networks
- H5 Data Centers Quincy 2/3Quincy, WA · 0 networks
Other datacenters nearby
- Intergate Quincy Data CenterSabey Data Centers · WA
- NTTData Data CenterWA
- Intergate ColumbiaWA
- H5 Data CenterIntuit · WA
- Yahoo Data CenterYahoo · WA
Nearby datacenter candidate sites
Scored candidate sites near Microsoft MWH Data Center, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| COLUMBIA | Substation-Adjacent | WA | Kittitas County | 500 kV | 1,000 MW | 1.7 yrs | 74.9 |
| UNKNOWN206104 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 1.7 yrs | 74.5 |
| TAP206102 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 1.7 yrs | 74.1 |
| UNKNOWN201377 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 1.7 yrs | 73.0 |
| TAP206103 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 1.7 yrs | 71.8 |
| Greenfield (GRAND COULEE 500KV - COLUMBIA) | Greenfield | WA | Grant County | 500 kV | 1,000 MW | 1.7 yrs | 71.3 |
| TAP206034 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 1.7 yrs | 70.8 |
| UNKNOWN209152 | Substation-Adjacent | WA | Grant County | 115 kV | 100 MW | 1.7 yrs | 70.8 |
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Microsoft MWH Data Center, WA. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.