MINIDOKA PROJECT

Federal Excess

Teton County, Wyoming · WECC

DC Readiness
47.9
Fair / 100

MINIDOKA PROJECT is a federal excess datacenter candidate site in Teton County, Wyoming, interconnecting through WECC. It screens at 47.9/100 DC Readiness and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

UtilityLOWER VALLEY ENERGY INCcooperativefavorable to large load · state default

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPJSLLC Bozeman
IXP distance126.0 mi
Fiber providers5
Fiber coverage44.1%
Max download109 Mbps

Site characteristics

Acreage873 ac
Buildable load (est.)~349–873 MWland-based
Former useReclamation and Irrigation

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score90/100

Location context

Nearest datacenterVentureData
DC distance52.6 mi
County hazard (FEMA NRI)Very Low (10)
DC tax incentiveYes (no_income_tax)
Commercial electricity10.17¢/kWh
Industrial electricity6.29¢/kWh
Cooling degree days300
Heating degree days7,600
Land price / acre$11,792

Regulatory climate

Favorablestate posture · as of 2026-08

Low-cost power and land; DC-friendly posture.

DC tax incentiveYes

Incentive detail: No state corporate or personal income tax; low property taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track MINIDOKA PROJECT

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
55
Fiber connectivity12%
36
Energy cost10%
50
Water risk7%
48
Natural hazard6%
90
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
70
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Teton County, ranked by DC Readiness.

Sites near MINIDOKA PROJECT
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN207237Substation-Adjacent115 kV100 MW6.9 yrs52.3
UNKNOWN207217Substation-Adjacent115 kV100 MW6.9 yrs51.5
UNKNOWN207216Substation-Adjacent115 kV100 MW6.9 yrs51.5
UNKNOWN207235Substation-Adjacent115 kV100 MW6.9 yrs51.5
UNKNOWN207219Substation-Adjacent115 kV100 MW6.9 yrs51.5
UNKNOWN207218Substation-Adjacent115 kV100 MW6.9 yrs51.5
UNKNOWN201830Substation-Adjacent115 kV100 MW6.9 yrs51.5
UNKNOWN207393Substation-Adjacent69 kV50 MW6.9 yrs49.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MINIDOKA PROJECT, Teton County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.