MINIDOKA PROJECT

Federal Excess

Teton County, Wyoming · WECC

DC Readiness
37.6
Limited / 100

MINIDOKA PROJECT is a federal excess datacenter candidate site in Teton County, Wyoming, interconnecting through WECC. It screens at 37.6/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionWECC
Queue depth74

Connectivity

Nearest IXPJSLLC Bozeman
IXP distance114.7 mi

Site characteristics

Acreage160 ac
Former useReclamation and Irrigation

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterVentureData
DC distance54.9 mi
County hazard (FEMA NRI)Very Low (10)
DC tax incentiveYes (no_income_tax)
Commercial electricity10.17¢/kWh
Industrial electricity6.29¢/kWh
Cooling degree days300
Heating degree days7,600
Land price / acre$11,792

Incentive detail: No state corporate or personal income tax; low property taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
25
Fiber connectivity12%
28
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
58
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Teton County, ranked by DC Readiness.

Sites near MINIDOKA PROJECT
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN207218Substation-Adjacent115 kV100 MW1.7 yrs57.0
UNKNOWN207237Substation-Adjacent115 kV100 MW1.7 yrs56.8
UNKNOWN207216Substation-Adjacent115 kV100 MW1.7 yrs55.7
UNKNOWN201830Substation-Adjacent115 kV100 MW1.7 yrs55.2
UNKNOWN207217Substation-Adjacent115 kV100 MW1.7 yrs55.1
UNKNOWN207219Substation-Adjacent115 kV100 MW1.7 yrs53.1
Greenfield (UNKNOWN207235 - UNKNOWN207237)Greenfield115 kV100 MW1.7 yrs52.2
UNKNOWN207235Substation-Adjacent115 kV100 MW1.7 yrs52.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MINIDOKA PROJECT, Teton County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.