North Platte Project at 42.326, -104.833

Federal Excess

Platte County, Wyoming · SPP

DC Readiness
51.6
Fair / 100

At a glance

North Platte Project at 42.326, -104.833 is a federal excess datacenter candidate site in Platte County, Wyoming, scoring 51.6/100 DC Readiness — 47th of 94 scored sites in the county. It sits in the SPP grid region and the WHEATLAND RURAL ELEC ASSN, INC service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

UtilityWHEATLAND RURAL ELEC ASSN, INCnot available

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth8
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPACT Wheatland
IXP distance20.6 mi
Fiber providers4
Fiber coverage25.2%

Site characteristics

Acreage40 ac
Buildable load (est.)~16–40 MWland-based
Former useReclamation and Irrigation

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score90/100

Location context

Nearest datacenterACT Wheatland
DC distance20.6 mi
County hazard (FEMA NRI)Very Low (10)
DC tax incentiveYes (no_income_tax)
Commercial electricity10.53¢/kWh
Industrial electricity7.72¢/kWh
Cooling degree days300
Heating degree days7,600
Land price / acre$1,028

Regulatory climate

Favorablestate posture · as of 2026-08

Low-cost power and land; DC-friendly posture.

DC tax incentiveYes

Incentive detail: No state corporate or personal income tax; low property taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track North Platte Project

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does North Platte Project at 42.326, -104.833 compare with other sites in Platte County?

North Platte Project at 42.326, -104.833 ranks 47th of 94 scored candidate sites in Platte County. Its 51.6/100 is roughly in line with the county average of 53.1. It is roughly in line with the Wyoming average of 52.2 and roughly in line with the national average of 53.2.

Against the Wyoming average, its strongest sub-score is fiber connectivity (65 vs 58) and its weakest is power availability (30 vs 38). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is North Platte Project at 42.326, -104.833 to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is ACT Wheatland at 20.6 miles. 4 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is ACT Wheatland, 20.6 miles away.

What are the flood, water and hazard risks at North Platte Project at 42.326, -104.833?

At the county level, FEMA's National Risk Index rates Platte County "Very Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
55
Fiber connectivity12%
65
Energy cost10%
50
Water risk7%
48
Natural hazard6%
90
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Platte County, ranked by DC Readiness.

Sites near North Platte Project at 42.326, -104.833
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN201471Substation-Adjacent345 kV600 MW4.3 yrs66.1
UNKNOWN203136Substation-Adjacent230 kV300 MW4.3 yrs63.9
UNKNOWN204238Substation-Adjacent230 kV300 MW4.3 yrs61.7
UNKNOWN209345Substation-Adjacent115 kV100 MW4.3 yrs61.2
UNKNOWN205647Substation-Adjacent115 kV100 MW4.3 yrs61.1
OZ PlatteGreenfield——4.3 yrs61.0
TAP204373Substation-Adjacent115 kV100 MW4.3 yrs59.9
UNKNOWN204242Substation-Adjacent115 kV100 MW4.3 yrs59.4

North Platte Project at 42.326, -104.833: common questions

What is the DC Readiness score of North Platte Project at 42.326, -104.833?

North Platte Project at 42.326, -104.833 scores 51.6/100 on the GridCensus DC Readiness scale, rated fair. It ranks 47th of 94 scored sites in Platte County. The Platte County average is 53.1 and the Wyoming average is 52.2.

Which electric utility serves North Platte Project at 42.326, -104.833?

WHEATLAND RURAL ELEC ASSN, INC (not available) holds the retail service territory that contains the site.

What grid region is North Platte Project at 42.326, -104.833 in?

North Platte Project at 42.326, -104.833 is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is North Platte Project at 42.326, -104.833 from an internet exchange?

The nearest internet exchange facility is ACT Wheatland, about 20.6 miles away; 4 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “North Platte Project at 42.326, -104.833, Platte County, WY”, https://gridcensus.com/datacenter-sites/wyoming/platte-county/north-platte-project-553f7295 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for North Platte Project at 42.326, -104.833, Platte County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.