EC Near Western Sugar Coop - Torrington

Greenfield

Goshen County, Wyoming · WECC

DC Readiness
56.6
Good / 100

EC Near Western Sugar Coop - Torrington is a greenfield datacenter candidate site in Goshen County, Wyoming, interconnecting through WECC. It screens at 56.6/100 DC Readiness and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.05¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPACT Wheatland
IXP distance35.8 mi
Fiber providers4
Fiber coverage42.2%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance403.9 mi

Site characteristics

Site typeGreenfield
Parcel ownerCITY OF TORRINGTON - (WY)
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops
Former usenear retired gas plant (10km)

Risk & environment

Flood zoneZone X
Water stress (WRI)2.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score90/100
Construction cost index87.2 (avg 100)

Location context

Nearest datacenterACT Wheatland
DC distance35.8 mi
Nearest rail2.8 mi
Nearest gas pipeline3.9 mi
Nearest fiber route33.4 mi
County hazard (FEMA NRI)Very Low (10)
DC tax incentiveYes (no_income_tax)
Commercial electricity4.88¢/kWh
Industrial electricity10.49¢/kWh
Cooling degree days300
Heating degree days7,600
Land price / acre$1,871

Incentive detail: No state corporate or personal income tax; low property taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
31
Fiber connectivity12%
60
Energy cost10%
94
Water risk8%
55
Natural hazard8%
90
Buildability7%
65
Labor market4%
50
DC cluster4%
40
Land / acreage3%
53
Construction cost3%
77
Gas pipeline2%
88
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Goshen County, ranked by DC Readiness.

Sites near EC Near Western Sugar Coop - Torrington
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN204262Substation-Adjacent115 kV100 MW1.7 yrs66.0
TAP204263Substation-Adjacent115 kV100 MW1.7 yrs65.1
Greenfield (UNKNOWN201471 - STEGALL)Greenfield345 kV600 MW1.7 yrs64.7
UNKNOWN209367Substation-Adjacent115 kV100 MW1.7 yrs64.6
Greenfield (UNKNOWN201471 - STEGALL)Greenfield345 kV600 MW1.7 yrs64.6
Western Sugar Coop - TorringtonBrownfield2 MW64.6
Greenfield (LARAMIE RIVER - UNKNOWN202177)Greenfield345 kV600 MW1.7 yrs64.4
TAP209361Substation-Adjacent115 kV100 MW1.7 yrs64.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Western Sugar Coop - Torrington, Goshen County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.