Skip to content
Gridcensus

Riverton (P-S)

Federal Excess

Fremont County, Wyoming · SPP

DC Readiness
51.7
Fair / 100

Riverton (P-S) is a federal excess datacenter candidate site in Fremont County, Wyoming, interconnecting through SPP. It screens at 51.7/100 DC Readiness and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

UtilityHIGH PLAINS POWER INCcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth8
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPACT Riverton
IXP distance12.6 mi
Fiber providers7
Fiber coverage16.8%

Site characteristics

Acreage39 ac
Buildable load (est.)~16–39 MWland-based
Former useReclamation and Irrigation

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score90/100

Location context

Nearest datacenterACT Riverton
DC distance12.6 mi
County hazard (FEMA NRI)Very Low (10)
DC tax incentiveYes (no_income_tax)
Commercial electricity10.53¢/kWh
Industrial electricity7.86¢/kWh
Cooling degree days300
Heating degree days7,600
Land price / acre$1,882

Regulatory climate

Favorablestate posture · as of 2026-08

Low-cost power and land; DC-friendly posture.

DC tax incentiveYes

Incentive detail: No state corporate or personal income tax; low property taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Riverton (P-S)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
55
Fiber connectivity12%
60
Energy cost10%
50
Water risk7%
48
Natural hazard6%
90
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Fremont County, ranked by DC Readiness.

Sites near Riverton (P-S)
SiteTypeVoltageCapacityQueue waitScore
TAP204229Substation-Adjacent230 kV300 MW4.3 yrs62.4
RIVERTONSubstation-Adjacent230 kV300 MW3.5 yrs62.3
UNKNOWN203122Substation-Adjacent230 kV300 MW4.3 yrs60.4
WYOPOSubstation-Adjacent230 kV300 MW4.3 yrs58.6
UNKNOWN202455Substation-Adjacent230 kV300 MW3.5 yrs58.3
EC Coal Fremont CountyGreenfield——4.3 yrs58.2
UNKNOWN201477Substation-Adjacent230 kV300 MW4.3 yrs57.5
EC Coal Fremont CountyGreenfield——3.5 yrs56.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Riverton (P-S), Fremont County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.