Dwp - Wind River Irrigation Project at 42.619, -108.713

Federal Excess

Fremont County, Wyoming · SPP

DC Readiness
45.4
Fair / 100

At a glance

Dwp - Wind River Irrigation Project at 42.619, -108.713 is a federal excess datacenter candidate site in Fremont County, Wyoming, scoring 45.4/100 DC Readiness — 198th of 211 scored sites in the county. It sits in the SPP grid region and the HIGH PLAINS POWER INC service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

UtilityHIGH PLAINS POWER INCcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth8
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPACT Riverton
IXP distance32.6 mi
Fiber providers7
Fiber coverage16.8%

Site characteristics

Acreage65 ac
Buildable load (est.)~26–65 MWland-based
Former useReclamation and Irrigation

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score90/100

Location context

Nearest datacenterACT Riverton
DC distance32.6 mi
County hazard (FEMA NRI)Very Low (10)
DC tax incentiveYes (no_income_tax)
Commercial electricity10.53¢/kWh
Industrial electricity7.86¢/kWh
Cooling degree days300
Heating degree days7,600
Land price / acre$1,882

Regulatory climate

Favorablestate posture · as of 2026-08

Low-cost power and land; DC-friendly posture.

DC tax incentiveYes

Incentive detail: No state corporate or personal income tax; low property taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track DWP - WIND RIVER IRRIGATION PROJECT

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Dwp - Wind River Irrigation Project at 42.619, -108.713 compare with other sites in Fremont County?

Dwp - Wind River Irrigation Project at 42.619, -108.713 ranks 198th of 211 scored candidate sites in Fremont County. Its 45.4/100 is about 10% below the county average of 50.6. It is about 13% below the Wyoming average of 52.2 and about 15% below the national average of 53.2.

Against the Wyoming average, its strongest sub-score is speed to power (55 vs 52) and its weakest is fiber connectivity (18 vs 58). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Dwp - Wind River Irrigation Project at 42.619, -108.713 to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is ACT Riverton at 32.6 miles. 7 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is ACT Riverton, 32.6 miles away.

What are the flood, water and hazard risks at Dwp - Wind River Irrigation Project at 42.619, -108.713?

At the county level, FEMA's National Risk Index rates Fremont County "Very Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
55
Fiber connectivity12%
18
Energy cost10%
50
Water risk7%
48
Natural hazard6%
90
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
59
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Fremont County, ranked by DC Readiness.

Sites near Dwp - Wind River Irrigation Project at 42.619, -108.713
SiteTypeVoltageCapacityQueue waitScore
TAP204229Substation-Adjacent230 kV300 MW4.3 yrs62.4
RIVERTONSubstation-Adjacent230 kV300 MW3.5 yrs62.3
UNKNOWN203122Substation-Adjacent230 kV300 MW4.3 yrs60.4
WYOPOSubstation-Adjacent230 kV300 MW4.3 yrs58.6
UNKNOWN202455Substation-Adjacent230 kV300 MW3.5 yrs58.3
EC Coal Fremont CountyGreenfield——4.3 yrs58.2
UNKNOWN201477Substation-Adjacent230 kV300 MW4.3 yrs57.5
EC Coal Fremont CountyGreenfield——3.5 yrs56.8

Dwp - Wind River Irrigation Project at 42.619, -108.713: common questions

What is the DC Readiness score of Dwp - Wind River Irrigation Project at 42.619, -108.713?

Dwp - Wind River Irrigation Project at 42.619, -108.713 scores 45.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 198th of 211 scored sites in Fremont County. The Fremont County average is 50.6 and the Wyoming average is 52.2.

Which electric utility serves Dwp - Wind River Irrigation Project at 42.619, -108.713?

HIGH PLAINS POWER INC (cooperative) holds the retail service territory that contains the site.

What grid region is Dwp - Wind River Irrigation Project at 42.619, -108.713 in?

Dwp - Wind River Irrigation Project at 42.619, -108.713 is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is Dwp - Wind River Irrigation Project at 42.619, -108.713 from an internet exchange?

The nearest internet exchange facility is ACT Riverton, about 32.6 miles away; 7 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Dwp - Wind River Irrigation Project at 42.619, -108.713, Fremont County, WY”, https://gridcensus.com/datacenter-sites/wyoming/fremont-county/dwp-wind-river-irrigation-project-4e887cc1 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Dwp - Wind River Irrigation Project at 42.619, -108.713, Fremont County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.