N Bookend - Parcel H
IndustrialWashington, Wisconsin · MISO
N Bookend - Parcel H is a industrial datacenter candidate site in Washington, Wisconsin, interconnecting through MISO. It screens at 45.8/100 DC Readiness.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Washington, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Greenfield (TAP138061 - GRANVILLE) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 70.4 |
| CEDARBURG SOUTH | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 70.4 |
| TAP138062 | Substation-Adjacent | 345 kV | 600 MW | 1.4 yrs | 69.1 |
| MEQUON | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 68.7 |
| Greenfield (TAP138061 - GRANVILLE) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 68.6 |
| Greenfield (TAP138061 - SHEBOYGAN FALLS ST) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 67.3 |
| Greenfield (TAP138062 - CYPRESS) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 66.6 |
| EC Near Omega Hills Gas Recovery | Greenfield | — | — | 1.4 yrs | 66.4 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for N Bookend - Parcel H, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.