N Bookend - Parcel B

Industrial

Washington, Wisconsin · MISO

DC Readiness
50.9
Fair / 100

At a glance

N Bookend - Parcel B is an industrial datacenter candidate site in Washington, Wisconsin, scoring 50.9/100 DC Readiness — 86th of 92 scored sites in the county. It sits in the MISO grid region and the WISCONSIN ELECTRIC POWER CO service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

UtilityWISCONSIN ELECTRIC POWER COinvestor ownedfavorable to large load · terms ≥ 100 MWVery Large Customer (VLC) tariff · 10 yr

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth133
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPEthoplex Data Center
IXP distance13.4 mi
Fiber providers7
Fiber coverage27.8%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterEthoplex Data Center
DC distance13.4 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.21¢/kWh
Industrial electricity9.16¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$9,471

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track N Bookend - Parcel B

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does N Bookend - Parcel B compare with other sites in Washington?

N Bookend - Parcel B ranks 86th of 92 scored candidate sites in Washington. Its 50.9/100 is roughly in line with the county average of 55.7. It is roughly in line with the Wisconsin average of 55.4 and roughly in line with the national average of 53.2.

Against the Wisconsin average, its strongest sub-score is natural hazard (78 vs 77) and its weakest is fiber connectivity (44 vs 67). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is N Bookend - Parcel B to power, fiber and other datacenters?

The nearest located transmission bottleneck is WEC34101_SUSSEX_36341_1 (MISO), 16 miles away. For connectivity, the nearest internet exchange facility is Ethoplex Data Center at 13.4 miles. 7 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Ethoplex Data Center, 13.4 miles away.

What are the flood, water and hazard risks at N Bookend - Parcel B?

At the county level, FEMA's National Risk Index rates Washington "Relatively Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
48
Fiber connectivity12%
44
Energy cost10%
50
Water risk7%
94
Natural hazard6%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Washington, ranked by DC Readiness.

Sites near N Bookend - Parcel B
SiteTypeVoltageCapacityQueue waitScore
TAP138061Substation-Adjacent345 kV600 MW4.3 yrs66.4
EC Near Omega Hills Gas RecoveryGreenfield——4.3 yrs64.2
EC Near Omega Hills Gas RecoveryGreenfield——4.3 yrs63.2
EC Near WPPI Hartford DGGreenfield——4.3 yrs62.9
GERMANTOWN SW YDSubstation-Adjacent138 kV100 MW4.3 yrs62.4
68TH STREETSubstation-Adjacent138 kV100 MW4.3 yrs61.0
PLEASANT VALLEYSubstation-Adjacent138 kV100 MW4.3 yrs60.9
CEDARBURG SOUTHSubstation-Adjacent138 kV100 MW4.3 yrs60.9

N Bookend - Parcel B: common questions

What is the DC Readiness score of N Bookend - Parcel B?

N Bookend - Parcel B scores 50.9/100 on the GridCensus DC Readiness scale, rated fair. It ranks 86th of 92 scored sites in Washington. The Washington average is 55.7 and the Wisconsin average is 55.4.

Which electric utility serves N Bookend - Parcel B?

WISCONSIN ELECTRIC POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is WISCONSIN ENERGY CORP.

What grid region is N Bookend - Parcel B in?

N Bookend - Parcel B is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is N Bookend - Parcel B from an internet exchange?

The nearest internet exchange facility is Ethoplex Data Center, about 13.4 miles away; 7 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “N Bookend - Parcel B, Washington, WI”, https://gridcensus.com/datacenter-sites/wisconsin/washington/n-bookend-parcel-b-fed7cbb8 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for N Bookend - Parcel B, Washington is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.