Westby - Vernon Electric Property

Shovel-Ready

Vernon, Wisconsin · MISO

DC Readiness
36.9
Limited / 100

Westby - Vernon Electric Property is a shovel-ready datacenter candidate site in Vernon, Wisconsin, interconnecting through MISO. It screens at 36.9/100 DC Readiness with a catalogued 40 MW of candidate capacity.

Power & interconnection

Available capacity40 MW

Speed to power

ISO / RTO regionMISO
Queue depth41

Connectivity

Nearest IXP901 Commerce Dr
IXP distance74.6 mi

Site characteristics

Site typeShovel-Ready
Acreage20 ac
Former useZoning: Industrial & Commercial; Co-op: Vernon Electric

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterDatacenter 1211362828
DC distance56.3 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.41¢/kWh
Industrial electricity9.00¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$5,236

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
28
Speed to power15%
40
Fiber connectivity12%
14
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
34
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Vernon, ranked by DC Readiness.

Sites near Westby - Vernon Electric Property
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN159041Substation-Adjacent161 kV100 MW1.4 yrs66.5
Greenfield (DPC BELL CENTER - UNKNOWN15904)Greenfield161 kV100 MW1.4 yrs63.2
EC Coal Vernon CountyGreenfield1.4 yrs61.5
EC Coal Vernon CountyGreenfield1.4 yrs61.2
EC Near GenoaGreenfield1.4 yrs59.8
OZ VernonGreenfield1.4 yrs59.3
EC Near GenoaGreenfield1.4 yrs58.2
EC Near GenoaGreenfield1.4 yrs58.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen