Stevens Point East Park Commerce Center

Shovel-Ready

Portage County, Wisconsin · MISO

DC Readiness
37.4
Limited / 100

Stevens Point East Park Commerce Center is a shovel-ready datacenter candidate site in Portage County, Wisconsin, interconnecting through MISO. It screens at 37.4/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth41

Connectivity

Nearest IXP901 Commerce Dr
IXP distance34.3 mi

Site characteristics

Site typeShovel-Ready
Acreage20 ac
Former useStatus: Active

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenter901 Commerce Dr
DC distance34.3 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.01¢/kWh
Industrial electricity8.14¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$4,888

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
40
Fiber connectivity12%
14
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
33
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Portage County, ranked by DC Readiness.

Sites near Stevens Point East Park Commerce Center
SiteTypeVoltageCapacityQueue waitScore
ROCKY RUNSubstation-Adjacent345 kV600 MW1.4 yrs75.8
Greenfield (GARDNER PARK - ROCKY RUN)Greenfield345 kV600 MW1.4 yrs71.0
ARNOTTSubstation-Adjacent138 kV100 MW1.4 yrs70.2
Greenfield (WERNER WEST - ROCKY RUN)Greenfield345 kV600 MW1.4 yrs68.8
Greenfield (WERNER WEST - ROCKY RUN)Greenfield345 kV600 MW1.4 yrs68.4
Greenfield (WERNER WEST - ROCKY RUN)Greenfield345 kV600 MW1.4 yrs67.8
HARTMAN CREEKSubstation-Adjacent138 kV100 MW1.4 yrs66.7
PLOVERSubstation-Adjacent115 kV100 MW1.4 yrs66.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Stevens Point East Park Commerce Center, Portage County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.