CWEC DEWEY is a substation-adjacent datacenter candidate site in Portage County, Wisconsin, interconnecting through MISO. It screens at 57.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationCWEC DEWEY
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW

Speed to power

ISO / RTO regionMISO
Queue depth27
Avg queue wait2.8 yrs

Connectivity

Nearest IXP901 Commerce Dr
IXP distance27.7 mi
Fiber providers8
Fiber coverage76.2%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenter901 Commerce Dr
DC distance27.7 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.01¢/kWh
Industrial electricity8.14¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$4,888

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
40
Fiber connectivity12%
46
Energy cost10%
50
Water risk8%
94
Natural hazard8%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Portage County, ranked by DC Readiness.

Sites near CWEC DEWEY
SiteTypeVoltageCapacityQueue waitScore
OZ PortageGreenfield1.4 yrs64.4
ROCKY RUNSubstation-Adjacent345 kV600 MW2.8 yrs63.0
EC Coal Portage CountyGreenfield1.4 yrs60.5
NORTHPOINTSubstation-Adjacent115 kV100 MW2.8 yrs56.9
UNKNOWN132911Substation-Adjacent115 kV100 MW2.8 yrs56.6
EC Coal Portage CountyGreenfield1.4 yrs56.5
UNKNOWN157838Substation-Adjacent115 kV100 MW2.8 yrs56.4
PLOVERSubstation-Adjacent115 kV100 MW2.8 yrs56.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CWEC DEWEY, Portage County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.