Marathon County, Wisconsin · MISO

DC Readiness
57.5
Good / 100

SHERMAN ST is a substation-adjacent datacenter candidate site in Marathon County, Wisconsin, interconnecting through MISO. It screens at 57.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSHERMAN ST
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityWISCONSIN PUBLIC SERVICE CORPinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth133
Avg queue wait2.8 yrs

Connectivity

Nearest IXP901 Commerce Dr
IXP distance32.7 mi
Fiber providers10
Fiber coverage66.5%

Site characteristics

Land contactMarathon County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenter901 Commerce Dr
DC distance32.7 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.60¢/kWh
Industrial electricity7.90¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$5,576

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track SHERMAN ST

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
45
Fiber connectivity12%
69
Energy cost10%
50
Water risk7%
94
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Marathon County, ranked by DC Readiness.

Sites near SHERMAN ST
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN133208Substation-Adjacent345 kV600 MW2.8 yrs66.8
GARDNER PARKSubstation-Adjacent345 kV600 MW2.8 yrs64.7
EC Near WestonGreenfield——1.4 yrs62.1
EC Near Domtar Paper Company RothschildGreenfield——1.4 yrs61.1
EC Near WestonGreenfield——1.4 yrs60.6
EC Near WestonGreenfield——1.4 yrs60.0
STRATFORDSubstation-Adjacent115 kV100 MW2.8 yrs60.0
EC Near WestonGreenfield——1.4 yrs59.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SHERMAN ST, Marathon County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.