La Crosse County, Wisconsin · MISO

DC Readiness
53.0
Fair / 100

TAP162921 is a substation-adjacent datacenter candidate site in La Crosse County, Wisconsin, interconnecting through MISO. It screens at 53.0/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP162921
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionMISO
Queue depth27
Avg queue wait2.8 yrs

Connectivity

Nearest IXP901 Commerce Dr
IXP distance53.0 mi
Fiber providers8
Fiber coverage65.9%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenter901 Commerce Dr
DC distance53.0 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.90¢/kWh
Industrial electricity8.71¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$6,527

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
40
Fiber connectivity12%
36
Energy cost10%
50
Water risk8%
94
Natural hazard8%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in La Crosse County, ranked by DC Readiness.

Sites near TAP162921
SiteTypeVoltageCapacityQueue waitScore
EC Coal La Crosse CountyGreenfield1.4 yrs61.8
BRIGGS ROADSubstation-Adjacent345 kV600 MW2.8 yrs61.3
UNKNOWN131978Substation-Adjacent161 kV100 MW2.8 yrs55.0
UNKNOWN131556Substation-Adjacent161 kV100 MW2.8 yrs55.0
COULEE AVESubstation-Adjacent161 kV100 MW2.8 yrs55.0
TAP139568Substation-Adjacent161 kV100 MW2.8 yrs55.0
UNKNOWN144322Substation-Adjacent69 kV50 MW2.8 yrs54.7
UNKNOWN131052Substation-Adjacent69 kV50 MW2.8 yrs54.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP162921, La Crosse County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.