LIPCO Trane Co Plant 6
IndustrialLa Crosse County, Wisconsin · MISO
At a glance
LIPCO Trane Co Plant 6 is an industrial datacenter candidate site in La Crosse County, Wisconsin, scoring 49.4/100 DC Readiness — 36th of 36 scored sites in the county. It sits in the MISO grid region, where interconnection has averaged 4.3 years from request to operation.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
Site location
Get alerts
Track LIPCO Trane Co Plant 6
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does LIPCO Trane Co Plant 6 compare with other sites in La Crosse County?
LIPCO Trane Co Plant 6 ranks 36th of 36 scored candidate sites in La Crosse County. Its 49.4/100 is roughly in line with the county average of 54.8. It is about 11% below the Wisconsin average of 55.4 and roughly in line with the national average of 53.2.
Against the Wisconsin average, its strongest sub-score is natural hazard (78 vs 77) and its weakest is fiber connectivity (52 vs 67). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is LIPCO Trane Co Plant 6 to power, fiber and other datacenters?
For connectivity, the nearest internet exchange facility is SFN MN-Rochester at 62.3 miles. 8 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is NP Rochester, 62.3 miles away.
What are the flood, water and hazard risks at LIPCO Trane Co Plant 6?
At the county level, FEMA's National Risk Index rates La Crosse County "Relatively Low".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in La Crosse County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| BRIGGS ROAD | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 64.1 |
| EC Coal La Crosse County | Greenfield | — | — | 4.3 yrs | 59.5 |
| UNKNOWN131556 | Substation-Adjacent | 161 kV | 100 MW | 4.3 yrs | 58.1 |
| UNKNOWN131978 | Substation-Adjacent | 161 kV | 100 MW | 4.3 yrs | 58.1 |
| COULEE AVE | Substation-Adjacent | 161 kV | 100 MW | 4.3 yrs | 58.1 |
| TAP139568 | Substation-Adjacent | 161 kV | 100 MW | 4.3 yrs | 57.9 |
| TAP159043 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 56.2 |
| UNKNOWN131052 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 56.2 |
LIPCO Trane Co Plant 6: common questions
What is the DC Readiness score of LIPCO Trane Co Plant 6?
LIPCO Trane Co Plant 6 scores 49.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 36th of 36 scored sites in La Crosse County. The La Crosse County average is 54.8 and the Wisconsin average is 55.4.
What grid region is LIPCO Trane Co Plant 6 in?
LIPCO Trane Co Plant 6 is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.
How far is LIPCO Trane Co Plant 6 from an internet exchange?
The nearest internet exchange facility is SFN MN-Rochester, about 62.3 miles away; 8 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “LIPCO Trane Co Plant 6, La Crosse County, WI”, https://gridcensus.com/datacenter-sites/wisconsin/la-crosse-county/lipco-trane-co-plant-6-eb00ea34 (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for LIPCO Trane Co Plant 6, La Crosse County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.