Skip to content
Gridcensus

Kewaunee County, Wisconsin · MISO

DC Readiness
51.1
Fair / 100

FIRST AVE is a substation-adjacent datacenter candidate site in Kewaunee County, Wisconsin, interconnecting through MISO. It screens at 51.1/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationFIRST AVE
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionMISO
Queue depth27
Avg queue wait2.8 yrs

Connectivity

Nearest IXPEthoplex Edge DC - Green Bay
IXP distance43.3 mi
Fiber providers4
Fiber coverage27.2%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterEthoplex Edge DC - Green Bay
DC distance43.3 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.17¢/kWh
Industrial electricity7.49¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$7,465

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
40
Fiber connectivity12%
19
Energy cost10%
50
Water risk8%
94
Natural hazard8%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Kewaunee County, ranked by DC Readiness.

Sites near FIRST AVE
SiteTypeVoltageCapacityQueue waitScore
EAST KROKSubstation-Adjacent138 kV100 MW2.8 yrs55.8
ROSIERESubstation-Adjacent138 kV100 MW2.8 yrs55.1
TAP163266Substation-Adjacent69 kV50 MW2.8 yrs53.7
CANALSubstation-Adjacent138 kV100 MW2.8 yrs53.4
Mine SiteFormer Mine2.8 yrs53.2
BEARDSLEY STSubstation-Adjacent69 kV50 MW2.8 yrs52.8
BARNETTSubstation-Adjacent69 kV50 MW2.8 yrs52.5
Fishermans PointIndustrial2.8 yrs51.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FIRST AVE, Kewaunee County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.