Skip to content
Gridcensus

Kewaunee County, Wisconsin · MISO

DC Readiness
54.4
Fair / 100

BEARDSLEY ST is a substation-adjacent datacenter candidate site in Kewaunee County, Wisconsin, interconnecting through MISO. It screens at 54.4/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationBEARDSLEY ST
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityWISCONSIN PUBLIC SERVICE CORPinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth133
Avg queue wait2.8 yrs

Connectivity

Nearest IXPEthoplex Edge DC - Green Bay
IXP distance26.8 mi
Fiber providers4
Fiber coverage27.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterEthoplex Edge DC - Green Bay
DC distance26.8 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.17¢/kWh
Industrial electricity7.49¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$7,465

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track BEARDSLEY ST

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
45
Fiber connectivity12%
53
Energy cost10%
50
Water risk7%
94
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Kewaunee County, ranked by DC Readiness.

Sites near BEARDSLEY ST
SiteTypeVoltageCapacityQueue waitScore
EAST KROKSubstation-Adjacent138 kV100 MW2.8 yrs57.2
ROSIERESubstation-Adjacent138 kV100 MW2.8 yrs56.8
TAP163266Substation-Adjacent69 kV50 MW2.8 yrs55.3
BARNETTSubstation-Adjacent69 kV50 MW2.8 yrs54.3
ALGOMASubstation-Adjacent69 kV50 MW2.8 yrs53.0
UNKNOWN156349Substation-Adjacent69 kV50 MW2.8 yrs52.6
MICHIGAN STSubstation-Adjacent69 kV50 MW2.8 yrs52.3
REDWOODSubstation-Adjacent69 kV50 MW2.8 yrs52.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BEARDSLEY ST, Kewaunee County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.