Skip to content
Gridcensus

EC Near Nelson Dewey Generating Station

Greenfield

Grant, Wisconsin · MISO

DC Readiness
53.4
Fair / 100

At a glance

EC Near Nelson Dewey Generating Station is a greenfield datacenter candidate site in Grant, Wisconsin, scoring 53.4/100 DC Readiness — 44th of 56 scored sites in the county. It sits in the MISO grid region, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.15¢/kWh

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth133
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPUSSHC
IXP distance25.9 mi
Fiber providers9
Fiber coverage64.3%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance115.8 mi

Site characteristics

Site typeGreenfield
Land contactGrant County Assessor
Land owner typeprivate
Buildability50.0/100
Former usenear retired coal plant (10km)

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score78/100
Construction cost index99.4 (avg 100)

Location context

Nearest datacenterUSSHC
DC distance25.9 mi
Nearest rail6.2 mi
Nearest gas pipeline8.3 mi
Nearest fiber route90.7 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity14.81¢/kWh
Industrial electricity10.35¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$6,306

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Nelson Dewey Generating Station

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EC Near Nelson Dewey Generating Station compare with other sites in Grant?

EC Near Nelson Dewey Generating Station ranks 44th of 56 scored candidate sites in Grant. Its 53.4/100 is roughly in line with the county average of 55.5. It is roughly in line with the Wisconsin average of 55.4 and roughly in line with the national average of 53.2.

Against the Wisconsin average, its strongest sub-score is natural hazard (78 vs 77) and its weakest is fiber connectivity (28 vs 67). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EC Near Nelson Dewey Generating Station to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is USSHC at 25.9 miles. 9 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is USSHC, 25.9 miles away.

What are the flood, water and hazard risks at EC Near Nelson Dewey Generating Station?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). WRI rates baseline water stress at 0.30 on a 0–5 scale. No mapped wetlands are recorded on the parcel. At the county level, FEMA's National Risk Index rates Grant "Relatively Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
48
Fiber connectivity12%
28
Energy cost10%
85
Water risk7%
91
Natural hazard6%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
65
Land / acreage3%
45
Construction cost3%
67
Gas pipeline2%
73
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Grant, ranked by DC Readiness.

Sites near EC Near Nelson Dewey Generating Station
SiteTypeVoltageCapacityQueue waitScore
EC Near Nelson Dewey Generating StationGreenfield——4.3 yrs60.4
EC Coal Grant CountyGreenfield——4.3 yrs59.6
EC Near Nelson Dewey Generating StationGreenfield——4.3 yrs59.5
EC Near Nelson Dewey Generating StationGreenfield——4.3 yrs59.4
EC Coal Grant CountyGreenfield——4.3 yrs59.4
EC Near Nelson Dewey Generating StationGreenfield——4.3 yrs59.2
EC Near Nelson Dewey Generating StationGreenfield——4.3 yrs58.6
EC Near Nelson Dewey Generating StationGreenfield——4.3 yrs58.5

EC Near Nelson Dewey Generating Station: common questions

What is the DC Readiness score of EC Near Nelson Dewey Generating Station?

EC Near Nelson Dewey Generating Station scores 53.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 44th of 56 scored sites in Grant. The Grant average is 55.5 and the Wisconsin average is 55.4.

What grid region is EC Near Nelson Dewey Generating Station in?

EC Near Nelson Dewey Generating Station is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

Is EC Near Nelson Dewey Generating Station in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

Who owns EC Near Nelson Dewey Generating Station?

Parcel records list the owner as AMERICAN TRANSMISSION CO (private land).

How far is EC Near Nelson Dewey Generating Station from an internet exchange?

The nearest internet exchange facility is USSHC, about 25.9 miles away; 9 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EC Near Nelson Dewey Generating Station, Grant, WI”, https://gridcensus.com/datacenter-sites/wisconsin/grant/ec-near-nelson-dewey-generating-station-08ad0dba (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Near Nelson Dewey Generating Station, Grant is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.