EC Coal Grant County
GreenfieldGrant, Wisconsin · MISO
EC Coal Grant County is a greenfield datacenter candidate site in Grant, Wisconsin, interconnecting through MISO. It screens at 59.1/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Grant, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| TAP136965 | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 68.2 |
| POTOSI | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 68.0 |
| LANCASTER | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 67.6 |
| HILLMAN | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 67.5 |
| NELSON DEWEY SW YD | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 65.2 |
| Greenfield (NELSON DEWEY SW YD - GRAN GRAE) | Greenfield | 161 kV | 100 MW | 1.4 yrs | 63.2 |
| EC Near Nelson Dewey Generating Station | Greenfield | — | — | 1.4 yrs | 61.7 |
| EC Coal Grant County | Greenfield | — | — | 1.4 yrs | 61.3 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen