Greenfield (UNKNOWN129869 - KING PLANT)

Greenfield

Dunn County, Wisconsin · MISO

DC Readiness
57.0
Good / 100

Greenfield (UNKNOWN129869 - KING PLANT) is a greenfield datacenter candidate site in Dunn County, Wisconsin, interconnecting through MISO. It screens at 57.0/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN129869
Substation voltage345 kV
Available capacity600 MW

Speed to power

ISO / RTO regionMISO
Queue depth27
Avg queue wait2.8 yrs

Connectivity

Nearest IXPSFN MN-Rochester
IXP distance69.8 mi
Fiber providers11
Fiber coverage74.2%

Site characteristics

Site typeGreenfield
Land contactDunn County County Assessor

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterWest Wisconsin Telcom DC
DC distance14.7 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.55¢/kWh
Industrial electricity8.44¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$4,904

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
59
Speed to power15%
40
Fiber connectivity12%
39
Energy cost10%
50
Water risk8%
94
Natural hazard8%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Dunn County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN129869 - KING PLANT)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN163358Substation-Adjacent161 kV100 MW2.8 yrs58.6
UNKNOWN131979Substation-Adjacent161 kV100 MW2.8 yrs58.0
UNKNOWN133295Substation-Adjacent69 kV50 MW2.8 yrs55.9
UNKNOWN163255Substation-Adjacent69 kV50 MW2.8 yrs55.1
ELK MOUNDSubstation-Adjacent69 kV50 MW2.8 yrs55.1
UNKNOWN132918Substation-Adjacent69 kV50 MW2.8 yrs55.1
UNKNOWN163529Substation-Adjacent69 kV50 MW2.8 yrs55.1
TAP163527Substation-Adjacent69 kV50 MW2.8 yrs55.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN129869 - KING PLANT), Dunn County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.