Wisconsin Power & Light Company Property
IndustrialCrawford County, Wisconsin · MISO
Wisconsin Power & Light Company Property is an industrial datacenter candidate site in Crawford County, Wisconsin, interconnecting through MISO. It screens at 52.6/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Crawford County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Crawford | Greenfield | — | — | 1.4 yrs | 63.3 |
| DPC BELL CENTER | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| GRAN GRAE | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| UNKNOWN107663 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 54.3 |
| Blackhawk Junction | Industrial | — | — | 2.8 yrs | 52.6 |
| Burlington Northern Santa Fe Railroad | Industrial | — | — | 2.8 yrs | 52.6 |
| Block 43 North | Industrial | — | — | 2.8 yrs | 52.6 |
| Prairie Maison | Industrial | — | — | 2.8 yrs | 52.5 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Wisconsin Power & Light Company Property, Crawford County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.