Crawford County, Wisconsin · MISO

DC Readiness
55.0
Good / 100

BRISBOIS is a substation-adjacent datacenter candidate site in Crawford County, Wisconsin, interconnecting through MISO. It screens at 55.0/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationBRISBOIS
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilitySCENIC RIVERS ENERGY COOPcooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth133
Avg queue wait2.8 yrs

Connectivity

Nearest IXPUSSHC
IXP distance53.9 mi
Fiber providers6
Fiber coverage50.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterUSSHC
DC distance53.9 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity14.43¢/kWh
Industrial electricity10.02¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$4,494

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track BRISBOIS

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
45
Fiber connectivity12%
64
Energy cost10%
50
Water risk7%
94
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Crawford County, ranked by DC Readiness.

Sites near BRISBOIS
SiteTypeVoltageCapacityQueue waitScore
OZ CrawfordGreenfield——1.4 yrs61.9
GRAN GRAESubstation-Adjacent161 kV100 MW2.8 yrs57.6
DPC BELL CENTERSubstation-Adjacent161 kV100 MW2.8 yrs56.8
UNKNOWN107663Substation-Adjacent161 kV100 MW2.8 yrs56.8
WAUZEKASubstation-Adjacent69 kV50 MW2.8 yrs54.9
TAP163121Substation-Adjacent69 kV50 MW2.8 yrs54.8
BOSCOBELSubstation-Adjacent69 kV50 MW2.8 yrs54.8
TAP163092Substation-Adjacent69 kV50 MW2.8 yrs54.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.