EC Near Danbury Diesel

Greenfield

Burnett, Wisconsin · MISO

DC Readiness
54.8
Fair / 100

EC Near Danbury Diesel is a greenfield datacenter candidate site in Burnett, Wisconsin, interconnecting through MISO. It screens at 54.8/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth41
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPDuluth Missabe
IXP distance54.9 mi
Fiber providers7
Fiber coverage46.3%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance287.7 mi

Site characteristics

Site typeGreenfield
Parcel ownerBurnett County Fc
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest
Former usenear retired oil plant (5km)

Risk & environment

Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score78/100
Construction cost index99.4 (avg 100)

Location context

Nearest datacenterDuluth Missabe
DC distance54.9 mi
Nearest rail2.6 mi
Nearest gas pipeline25.4 mi
Nearest fiber route14.3 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.01¢/kWh
Industrial electricity13.86¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$3,584

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
47
Fiber connectivity12%
46
Energy cost10%
85
Water risk8%
86
Natural hazard8%
78
Buildability7%
45
Labor market4%
50
DC cluster4%
40
Land / acreage3%
50
Construction cost3%
67
Gas pipeline2%
18
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Burnett, ranked by DC Readiness.

Sites near EC Near Danbury Diesel
SiteTypeVoltageCapacityQueue waitScore
Danbury DieselBrownfield7 MW1.4 yrs57.5
EC Near Danbury DieselGreenfield1.4 yrs56.4
EC Near Danbury DieselGreenfield1.4 yrs55.3
EC Near Danbury DieselGreenfield1.4 yrs55.0
EC Near Danbury DieselGreenfield1.4 yrs54.6
EC Near Danbury DieselGreenfield1.4 yrs52.8
EC Near Danbury DieselGreenfield1.4 yrs52.4
EC Near Danbury DieselGreenfield1.4 yrs52.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Danbury Diesel, Burnett. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.