OXFORD FCI

Federal Excess

Adams County, Wisconsin · MISO

DC Readiness
55.8
Good / 100

OXFORD FCI is a federal excess datacenter candidate site in Adams County, Wisconsin, interconnecting through MISO. It screens at 55.8/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth27
Avg queue wait2.8 yrs

Connectivity

Nearest IXPSupraNet Communications Madison
IXP distance54.7 mi
Fiber providers5
Fiber coverage89.1%

Site characteristics

Acreage640 ac
Former useInstitutional

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterMarquette-Adams Telephone Coop
DC distance6.6 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.27¢/kWh
Industrial electricity9.16¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$5,155

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
40
Fiber connectivity12%
74
Energy cost10%
50
Water risk8%
94
Natural hazard8%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
60
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Adams County, ranked by DC Readiness.

Sites near OXFORD FCI
SiteTypeVoltageCapacityQueue waitScore
BADGER WESTSubstation-Adjacent138 kV100 MW2.8 yrs57.3
TAP158760Substation-Adjacent69 kV50 MW2.8 yrs55.8
TAP158762Substation-Adjacent69 kV50 MW2.8 yrs55.8
CHAFFEE CREEKSubstation-Adjacent69 kV50 MW2.8 yrs55.8
MCKENNASubstation-Adjacent69 kV50 MW2.8 yrs55.8
TAP158934Substation-Adjacent69 kV50 MW2.8 yrs55.8
ACEC BROOKSSubstation-Adjacent69 kV50 MW2.8 yrs55.8
LINCOLN PUMP STASubstation-Adjacent69 kV50 MW2.8 yrs55.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OXFORD FCI, Adams County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.