GRAND COULEE PROJECT

Federal Excess

Ferry County, Washington · WECC

DC Readiness
48.5
Fair / 100

GRAND COULEE PROJECT is a federal excess datacenter candidate site in Ferry County, Washington, interconnecting through WECC. It screens at 48.5/100 DC Readiness and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPNeutron - Spokane
IXP distance77.6 mi
Fiber providers4
Fiber coverage12.2%

Site characteristics

Acreage113 ac
Former usePower Development and Distribution

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score72/100

Location context

Nearest datacenterLumen
DC distance77.8 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.01¢/kWh
Industrial electricity7.39¢/kWh
Cooling degree days300
Heating degree days5,000
Land price / acre$929

Incentive detail: Sales tax exemption on DC equipment and construction for eligible facilities; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
42
Fiber connectivity12%
54
Energy cost10%
50
Water risk8%
64
Natural hazard8%
72
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
63
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Ferry County, ranked by DC Readiness.

Sites near GRAND COULEE PROJECT
SiteTypeVoltageCapacityQueue waitScore
OZ FerryGreenfield1.7 yrs54.6
OZ FerryGreenfield1.7 yrs52.8
KELLERSubstation-Adjacent115 kV100 MW6.9 yrs49.1
REPUBLICSubstation-Adjacent115 kV100 MW6.9 yrs49.1
TAP207731Substation-Adjacent115 kV100 MW6.9 yrs49.1
NESPELEMSubstation-Adjacent115 kV100 MW6.9 yrs49.1
UNKNOWN207730Substation-Adjacent115 kV100 MW6.9 yrs49.1
GRAND COULEE PROJECTFederal Excess6.9 yrs48.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for GRAND COULEE PROJECT, Ferry County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.