WYTHE STONE CO. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING)
ManufacturingWYTHE, Virginia · PJM
At a glance
WYTHE STONE CO. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING) is a manufacturing datacenter candidate site in WYTHE, Virginia, scoring 48.6/100 DC Readiness — 57th of 58 scored sites in the county. It sits in the PJM grid region, where interconnection has averaged 5.1 years from request to operation.
Power & interconnection
Speed to power
Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.
Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
Site location
Get alerts
Track WYTHE STONE CO. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING)
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does WYTHE STONE CO. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING) compare with other sites in WYTHE?
WYTHE STONE CO. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING) ranks 57th of 58 scored candidate sites in WYTHE. Its 48.6/100 is roughly in line with the county average of 50.2. It is roughly in line with the Virginia average of 52.6 and roughly in line with the national average of 53.2.
Against the Virginia average, its strongest sub-score is water (88 vs 88) and its weakest is natural hazard (55 vs 69). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is WYTHE STONE CO. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING) to power, fiber and other datacenters?
The nearest located transmission bottleneck is FREMNT-FREMONTC A 138 KV (PJM), 77 miles away. For connectivity, the nearest internet exchange facility is 801 Main Street - Lenoir at 76 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is 801 Main Street - Lenoir, 76 miles away.
What are the flood, water and hazard risks at WYTHE STONE CO. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING)?
The site is in FEMA flood zone A, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding. At the county level, FEMA's National Risk Index rates WYTHE "Relatively Moderate".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in WYTHE, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Greenfield (JACKSONS FERRY - BROADFORD (76) | Greenfield | 765 kV | 1,000 MW | 5.1 yrs | 57.6 |
| UNKNOWN117058 | Substation-Adjacent | 138 kV | 100 MW | 5.1 yrs | 56.0 |
| LEE HIGHWAY | Substation-Adjacent | 138 kV | 100 MW | 5.1 yrs | 56.0 |
| TAP152824 | Substation-Adjacent | 138 kV | 100 MW | 5.1 yrs | 55.9 |
| PROGRESS PARK | Substation-Adjacent | 138 kV | 100 MW | 5.1 yrs | 55.9 |
| UNKNOWN117063 | Substation-Adjacent | 138 kV | 100 MW | 5.1 yrs | 55.1 |
| UNKNOWN117064 | Substation-Adjacent | 138 kV | 100 MW | 5.1 yrs | 55.1 |
| Wythe County Progress Park | Shovel-Ready | — | — | 5.1 yrs | 50.0 |
WYTHE STONE CO. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING): common questions
What is the DC Readiness score of WYTHE STONE CO. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING)?
WYTHE STONE CO. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING) scores 48.6/100 on the GridCensus DC Readiness scale, rated fair. It ranks 57th of 58 scored sites in WYTHE. The WYTHE average is 50.2 and the Virginia average is 52.6.
What grid region is WYTHE STONE CO. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING) in?
WYTHE STONE CO. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING) is in the PJM region. Projects interconnecting there have averaged a 5.1-year wait from queue request to operation.
Is WYTHE STONE CO. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING) in a flood zone?
The site is in FEMA flood zone A, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding.
How far is WYTHE STONE CO. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING) from an internet exchange?
The nearest internet exchange facility is 801 Main Street - Lenoir, about 76 miles away; 5 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “WYTHE STONE CO. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING), WYTHE, VA”, https://gridcensus.com/datacenter-sites/virginia/wythe/wythe-stone-co-all-other-miscellaneous-nonmetallic-mineral-product-manufacturing-041caa63 (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for WYTHE STONE CO. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING), WYTHE is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.