Mt. Jackson Industrial Park

Shovel-Ready

Shenandoah, Virginia · PJM

DC Readiness
49.9
Fair / 100

At a glance

Mt. Jackson Industrial Park is a shovel-ready datacenter candidate site in Shenandoah, Virginia, scoring 49.9/100 DC Readiness — 39th of 51 scored sites in the county. It sits in the PJM grid region and the VIRGINIA ELECTRIC & POWER CO service territory, where interconnection has averaged 5.1 years from request to operation.

Power & interconnection

UtilityVIRGINIA ELECTRIC & POWER COinvestor ownedmoderate to large load · terms ≥ 25 MWSchedule GS-5 (large general service, ≥25 MW) · 85% min take · 14 yr

Speed to power

Interconnection outlookConstrained
≈ 6.0 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth907
Avg queue wait5.1 yrs
Recent queue wait6.0 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPEquinix CU1/CU2/CU3/CU4 - Culpeper
IXP distance41.3 mi
Fiber providers3
Fiber coverage35.2%

Site characteristics

Site typeShovel-Ready
Acreage40 ac
Buildable load (est.)~16–40 MWland-based
Land contactShenandoah County Assessor
Former useVBRSP Certified

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterDBT Data - Harrisonburg Center
DC distance21.0 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.00¢/kWh
Industrial electricity6.27¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$7,334

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Mt. Jackson Industrial Park

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Mt. Jackson Industrial Park compare with other sites in Shenandoah?

Mt. Jackson Industrial Park ranks 39th of 51 scored candidate sites in Shenandoah. Its 49.9/100 is roughly in line with the county average of 50.7. It is roughly in line with the Virginia average of 52.6 and roughly in line with the national average of 53.2.

Against the Virginia average, its strongest sub-score is natural hazard (70 vs 69) and its weakest is fiber connectivity (59 vs 71). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Mt. Jackson Industrial Park to power, fiber and other datacenters?

The nearest located transmission bottleneck is CHARLTSV-PROFITDP 2054B1 A 230 KV (PJM), 46 miles away. For connectivity, the nearest internet exchange facility is Equinix CU1/CU2/CU3/CU4 - Culpeper at 41.3 miles. 3 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is DBT Data - Harrisonburg Center, 21 miles away.

What are the flood, water and hazard risks at Mt. Jackson Industrial Park?

At the county level, FEMA's National Risk Index rates Shenandoah "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
59
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Shenandoah, ranked by DC Readiness.

Sites near Mt. Jackson Industrial Park
SiteTypeVoltageCapacityQueue waitScore
EDINBURGSubstation-Adjacent138 kV100 MW5.1 yrs56.4
MOUNT JACKSONSubstation-Adjacent115 kV100 MW5.1 yrs56.0
MOUNT JACKSON D.P.Substation-Adjacent115 kV100 MW5.1 yrs55.9
O-N MINERALS, CHEMSTONE OPERATIONS (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing——5.1 yrs51.7
Moonrise PropertiesShovel-Ready——5.1 yrs51.3
North Shenandoah Industrial & Business ParkShovel-Ready——5.1 yrs51.3
I-81 Interstate LandShovel-Ready——5.1 yrs51.0
PALLET RECYCLING (WOOD CONTAINER AND PALLET MANUFACTURING)Manufacturing——5.1 yrs50.9

Mt. Jackson Industrial Park: common questions

What is the DC Readiness score of Mt. Jackson Industrial Park?

Mt. Jackson Industrial Park scores 49.9/100 on the GridCensus DC Readiness scale, rated fair. It ranks 39th of 51 scored sites in Shenandoah. The Shenandoah average is 50.7 and the Virginia average is 52.6.

Which electric utility serves Mt. Jackson Industrial Park?

VIRGINIA ELECTRIC & POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is DOMINION RESOURCES.

What grid region is Mt. Jackson Industrial Park in?

Mt. Jackson Industrial Park is in the PJM region. Projects interconnecting there have averaged a 5.1-year wait from queue request to operation.

How far is Mt. Jackson Industrial Park from an internet exchange?

The nearest internet exchange facility is Equinix CU1/CU2/CU3/CU4 - Culpeper, about 41.3 miles away; 3 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Mt. Jackson Industrial Park, Shenandoah, VA”, https://gridcensus.com/datacenter-sites/virginia/shenandoah/mt-jackson-industrial-park-8222f47e (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Mt. Jackson Industrial Park, Shenandoah is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.