SALEM PRECISION MACHINE & FABRICATION (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING)
ManufacturingSALEM (CITY), Virginia
SALEM PRECISION MACHINE & FABRICATION (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING) is a manufacturing datacenter candidate site in SALEM (CITY), Virginia. It screens at 48.9/100 DC Readiness.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in SALEM (CITY), ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| CLOVERDALE 765KV | Substation-Adjacent | 765 kV | 1,000 MW | 3.0 yrs | 73.9 |
| MATT FUNK | Substation-Adjacent | 345 kV | 600 MW | 3.0 yrs | 71.4 |
| Greenfield (CLOVERDALE 765KV - JACKSONS FE) | Greenfield | 765 kV | 1,000 MW | 3.0 yrs | 68.6 |
| BENT MOUNTAIN | Substation-Adjacent | 138 kV | 100 MW | 3.0 yrs | 68.4 |
| POAGES MILL | Substation-Adjacent | 138 kV | 100 MW | 3.1 yrs | 67.4 |
| WEST SALEM | Substation-Adjacent | 138 kV | 100 MW | 3.0 yrs | 66.6 |
| Greenfield (CLOVERDALE - MATT FUNK) | Greenfield | 345 kV | 600 MW | 3.0 yrs | 63.2 |
| HANCOCK | Substation-Adjacent | 138 kV | 100 MW | 3.0 yrs | 60.1 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for SALEM PRECISION MACHINE & FABRICATION (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING), SALEM (CITY). Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.