Salem VA Medical Center Solar

Brownfield

SALEM (CITY), Virginia · PJM

DC Readiness
61.5
Good / 100

Salem VA Medical Center Solar is a brownfield datacenter candidate site in SALEM (CITY), Virginia, interconnecting through PJM. It screens at 61.5/100 DC Readiness with a catalogued 2 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP151812
Substation distance0.3 mi
Available capacity2 MW
LMP zonePJM_DOM
Wholesale LMP$41.20/MWh
UtilityCITY OF SALEM - (VA)municipal

Speed to power

Interconnection outlookConstrained
≈ 3.8 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth878
Avg queue wait3.8 yrs

Connectivity

Nearest IXPCitynet Charleston
IXP distance113.7 mi
Fiber providers3
Fiber coverage86.9%
Nearest cloud providerAzure
Nearest cloud regioneastus
Cloud region distance101.5 mi

Site characteristics

Site typeBrownfield
Acreage6 ac
Buildable load (est.)~2–6 MWland-based· grid headroom is tighter
Land owner typeprivate
Buildability75.0/100
Former uselandfill
Existing capacity2 MW
Cleanup statuscleanup_complete

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteROANOKE COUNTY SCHOOLS
Hazard sub-score60/100
Construction cost index0.0 (avg 100)

Location context

Nearest datacenterLumos Networks
DC distance50.9 mi
Nearest rail0.3 mi
Nearest gas pipeline2.1 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Cooling degree days1,300
Heating degree days4,000
Land price / acre$5,900

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Salem VA Medical Center Solar

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
49
Speed to power20%
45
Fiber connectivity12%
73
Energy cost10%
71
Water risk7%
88
Natural hazard6%
60
Buildability7%
75
Labor market4%
50
DC cluster4%
45
Land / acreage3%
57
Construction cost3%
100
Gas pipeline2%
93
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in SALEM (CITY), ranked by DC Readiness.

Sites near Salem VA Medical Center Solar
SiteTypeVoltageCapacityQueue waitScore
OZ SalemGreenfield——3.1 yrs58.0
HANCOCKSubstation-Adjacent138 kV100 MW3.8 yrs56.5
CATAWBASubstation-Adjacent138 kV100 MW3.8 yrs56.3
WEST SALEMSubstation-Adjacent138 kV100 MW3.8 yrs56.3
POAGES MILLSubstation-Adjacent138 kV100 MW3.8 yrs56.2
BENT MOUNTAINSubstation-Adjacent138 kV100 MW3.8 yrs56.1
INFORMATION PRODUCTS CO., INC. (COATED AND LAMINATED PAPER MANUFACTURING)Manufacturing——3.5 yrs52.9
KIK CUSTOM PRODUCTS (POLISH AND OTHER SANITATION GOOD MANUFACTURING)Manufacturing——3.5 yrs52.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Salem VA Medical Center Solar, SALEM (CITY). Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.