EC Near Mecklenburg Power Station

Greenfield

Mecklenburg County, Virginia · PJM

DC Readiness
58.8
Good / 100

EC Near Mecklenburg Power Station is a greenfield datacenter candidate site in Mecklenburg County, Virginia, interconnecting through PJM. It screens at 58.8/100 DC Readiness and a 3.1 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_DOM
Wholesale LMP$43.92/MWh
Utility commercial rate0.05¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth864
Avg queue wait3.1 yrs
Recent queue wait3.6 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPCyrusOne NC-1
IXP distance47.0 mi
Fiber providers4
Fiber coverage55.7%
Nearest cloud providerAzure
Nearest cloud regioneastus2
Cloud region distance11.1 mi

Site characteristics

Site typeGreenfield
Parcel ownerVIRGINIA ELECTRIC & POWER CO
Land owner typeprivate
Buildability40.0/100
Land cover (NLCD)Evergreen Forest
Former usenear retired coal plant (5km)

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score70/100
Construction cost index97.5 (avg 100)

Location context

Nearest datacenterMicrosoft Boydton
DC distance11.1 mi
Nearest rail1.7 mi
Nearest gas pipeline13.1 mi
Nearest fiber route8.6 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity5.45¢/kWh
Industrial electricity5.96¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$3,268

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
44
Fiber connectivity12%
63
Energy cost10%
95
Water risk8%
89
Natural hazard8%
70
Buildability7%
40
Labor market4%
50
DC cluster4%
95
Land / acreage3%
46
Construction cost3%
69
Gas pipeline2%
58
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Mecklenburg County, ranked by DC Readiness.

Sites near EC Near Mecklenburg Power Station
SiteTypeVoltageCapacityQueue waitScore
Greenfield (CLOVER - UNKNOWN175464)Greenfield500 kV1,000 MW3.1 yrs70.1
TAP147994Substation-Adjacent115 kV100 MW3.1 yrs70.0
TAP147996Substation-Adjacent115 kV100 MW3.1 yrs69.9
CHASE CITYSubstation-Adjacent115 kV100 MW3.1 yrs69.3
KERR DAMSubstation-Adjacent115 kV100 MW3.1 yrs69.3
BEECHWOOD DPSubstation-Adjacent115 kV100 MW3.1 yrs68.1
SOUTH HILLSubstation-Adjacent115 kV100 MW3.1 yrs67.9
BURLINGTON DPSubstation-Adjacent115 kV100 MW3.1 yrs67.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Mecklenburg Power Station, Mecklenburg County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.