OZ Bedford is a greenfield datacenter candidate site in Bedford County, Virginia, interconnecting through PJM. It screens at 58.5/100 DC Readiness and a 3.1 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Bedford County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| FERGUSON ENTERPRISES, INC. (FABRICATED PIPE AND PIPE FITTING MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.0 |
| INTERCON, INC. (OTHER ELECTRONIC COMPONENT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.0 |
| SECKMAN PRINTING (OTHER COMMERCIAL PRINTING) | Manufacturing | — | — | 3.5 yrs | 55.0 |
| AUTOMATED INDUSTRIAL TECHNOLOGIES, INC. (MACHINE SHOPS) | Manufacturing | — | — | 3.5 yrs | 55.0 |
| ATCO PRODUCTS, INC. (GASKET, PACKING, AND SEALING DEVICE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.0 |
| INNOVATIVE MACHINING, INC. (MACHINE SHOPS) | Manufacturing | — | — | 3.5 yrs | 55.0 |
| UNKNOWN147624 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 55.0 |
| SENTRY EQUIPMENT ERECTORS, INC. (CONVEYOR AND CONVEYING EQUIPMENT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 55.0 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for OZ Bedford, Bedford County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.