Moretown is a brownfield datacenter candidate site in Washington County, Vermont, interconnecting through ISO-NE. It screens at 55.4/100 DC Readiness with a catalogued 3 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Available capacity3 MW
LMP zoneISONE_VT
Wholesale LMP$69.07/MWh
Utility commercial rate0.19¢/kWh
UtilityGREEN MOUNTAIN POWER CORPinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionISO-NE
Queue depth5
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate25%
Withdrawal rate75%

Connectivity

Nearest IXPTech Vault South Burlington
IXP distance23.4 mi
Fiber providers12
Fiber coverage68.8%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance439.4 mi

Site characteristics

Site typeBrownfield
Parcel ownerAdvanced Disposal
Land contactState Environmental Cleanup Program
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity
Former usegas
Existing capacity3 MW
Retirement date2023-12-01

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteWSI MORETOWN LANDFILL INC
Hazard sub-score75/100
Construction cost index83.2 (avg 100)

Location context

Nearest datacenterTech Vault South Burlington
DC distance23.4 mi
Nearest rail0.3 mi
Nearest gas pipeline25.5 mi
Nearest fiber route121.4 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity19.17¢/kWh
Industrial electricity11.03¢/kWh
Cooling degree days400
Heating degree days7,400
Land price / acre$5,057

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Moretown

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
23
Speed to power20%
38
Fiber connectivity12%
76
Energy cost10%
70
Water risk7%
91
Natural hazard6%
75
Buildability7%
92
Labor market4%
50
DC cluster4%
60
Land / acreage3%
58
Construction cost3%
81
Gas pipeline2%
18
Tax incentive1%
0
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Washington County, ranked by DC Readiness.

Sites near Moretown
SiteTypeVoltageCapacityQueue waitScore
EC Near MoretownGreenfield——3.5 yrs57.9
TAP136824Substation-Adjacent115 kV100 MW3.9 yrs57.3
EC Near MoretownGreenfield——3.5 yrs57.0
UNKNOWN132796Substation-Adjacent115 kV100 MW3.9 yrs56.8
BARRESubstation-Adjacent115 kV100 MW3.9 yrs56.4
EC Near MoretownGreenfield——3.5 yrs56.3
EC Near MoretownGreenfield——3.5 yrs56.1
OZ WashingtonGreenfield——3.5 yrs56.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen