Skip to content
Gridcensus

UNKNOWN206146

Substation-Adjacent

Tooele County, Utah · WECC

DC Readiness
53.1
Fair / 100

UNKNOWN206146 is a substation-adjacent datacenter candidate site in Tooele County, Utah, interconnecting through WECC. It screens at 53.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN206146
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPEdgeConneX Salt Lake City (EDCSLC01)
IXP distance64.0 mi
Fiber providers9
Fiber coverage67.8%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterEbay
DC distance62.7 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.56¢/kWh
Industrial electricity7.55¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$3,447

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN206146

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
44
Fiber connectivity12%
65
Energy cost10%
50
Water risk7%
24
Natural hazard6%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Tooele County, ranked by DC Readiness.

Sites near UNKNOWN206146
SiteTypeVoltageCapacityQueue waitScore
EC Coal Tooele CountyGreenfield——1.7 yrs63.9
OZ TooeleGreenfield——1.7 yrs61.2
EC Near US MagnesiumGreenfield——1.7 yrs57.1
EC Near US MagnesiumGreenfield——1.7 yrs56.4
EC Near US MagnesiumGreenfield——1.7 yrs56.4
EC Near US MagnesiumGreenfield——1.7 yrs56.2
EC Near US MagnesiumGreenfield——1.7 yrs55.0
UNKNOWN202988Substation-Adjacent115 kV100 MW6.9 yrs54.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN206146, Tooele County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.