CUP, BONNEVILLE UNIT

Federal Excess

Duchesne County, Utah · WECC

DC Readiness
38.4
Limited / 100

CUP, BONNEVILLE UNIT is a federal excess datacenter candidate site in Duchesne County, Utah, interconnecting through WECC. It screens at 38.4/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionWECC
Queue depth74

Connectivity

Nearest IXPVoonami SLC1
IXP distance48.8 mi

Site characteristics

Acreage100 ac
Former useReclamation and Irrigation

Risk & environment

Water stress (WRI)High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterVoonami SLC1
DC distance48.8 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.88¢/kWh
Industrial electricity9.77¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$1,649

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
25
Fiber connectivity12%
34
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
58
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Duchesne County, ranked by DC Readiness.

Sites near CUP, BONNEVILLE UNIT
SiteTypeVoltageCapacityQueue waitScore
Greenfield (BONANZA - MONA)Greenfield345 kV600 MW1.7 yrs64.1
TAP205950Substation-Adjacent138 kV100 MW1.7 yrs63.0
UPALCOSubstation-Adjacent138 kV100 MW1.7 yrs62.9
Greenfield (BONANZA - MONA)Greenfield345 kV600 MW1.7 yrs62.5
Greenfield (BONANZA - MONA)Greenfield345 kV600 MW1.7 yrs62.0
UNKNOWN202521Substation-Adjacent138 kV100 MW1.7 yrs61.7
UNKNOWN202494Substation-Adjacent138 kV100 MW1.7 yrs61.7
Greenfield (BONANZA - MONA)Greenfield345 kV600 MW1.7 yrs60.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CUP, BONNEVILLE UNIT, Duchesne County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.