Skip to content
Gridcensus

WEBER BASIN

Federal Excess

Box Elder County, Utah · WECC

DC Readiness
50.0
Fair / 100

WEBER BASIN is a federal excess datacenter candidate site in Box Elder County, Utah, interconnecting through WECC. It screens at 50.0/100 DC Readiness and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPLowest Host/Empire Technology
IXP distance42.4 mi
Fiber providers10
Fiber coverage70.1%

Site characteristics

Acreage110 ac
Buildable load (est.)~44–110 MWland-based
Land contactBox Elder County County Assessor
Former useReclamation and Irrigation

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterLowest Host/Empire Technology
DC distance42.4 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.04¢/kWh
Industrial electricity7.51¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$2,495

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track WEBER BASIN

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
57
Fiber connectivity12%
69
Energy cost10%
50
Water risk7%
24
Natural hazard6%
85
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
66
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Box Elder County, ranked by DC Readiness.

Sites near WEBER BASIN
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN202589Substation-Adjacent115 kV100 MW6.9 yrs54.8
CURLEWSubstation-Adjacent138 kV100 MW6.9 yrs54.7
UNKNOWN206660Substation-Adjacent115 kV100 MW6.9 yrs53.9
UNKNOWN206143Substation-Adjacent138 kV100 MW6.9 yrs53.7
UNKNOWN202591Substation-Adjacent138 kV100 MW6.9 yrs53.6
UNKNOWN206144Substation-Adjacent115 kV100 MW6.9 yrs53.1
TAP206665Substation-Adjacent69 kV50 MW6.9 yrs52.0
WEBER BASINFederal Excess——6.9 yrs50.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WEBER BASIN, Box Elder County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.