OZ Hall

Greenfield

Hall, Texas · SPP

DC Readiness
54.3
Fair / 100

OZ Hall is a greenfield datacenter candidate site in Hall, Texas, interconnecting through SPP. It screens at 54.3/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest grid bottleneckMIL_LIPAN_1 · 57 km (ERCOT)
LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.08¢/kWh
UtilitySOUTH PLAINS ELECTRIC COOP INCcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth46
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPAmarillo Petroleum Building
IXP distance80.5 mi
Fiber providers4
Fiber coverage75.4%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance254.1 mi

Site characteristics

Site typeGreenfield
Parcel ownerMullin Ronald Lynn
Land contactHall County Assessor
Land owner typeprivate
Buildability50.0/100

Risk & environment

Environmental constraintLow (15/100)
Flood zoneZone X
Water stress (WRI)2.80
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score35/100
Construction cost index103.6 (avg 100)

Location context

Nearest datacenterArgo Data Center
DC distance53.2 mi
Nearest rail14.0 mi
Nearest gas pipeline14.3 mi
Nearest fiber route59.9 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.24¢/kWh
Industrial electricity9.42¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$1,274

Regulatory climate

Favorablestate posture · as of 2026-08

No statewide moratorium, but since Aug 3, 2026 ERCOT has paused approvals to energize new datacenter and crypto loads ≥75 MW pending an audit due Dec 10, 2026. SB 6 adds large-load obligations above 75 MW.

DC tax incentiveYes
Large-load threshold≥ 75 MW

SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 2 nearby

Get alerts

Track OZ Hall

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
67
Fiber connectivity12%
60
Energy cost10%
94
Water risk7%
54
Natural hazard6%
35
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
64
Gas pipeline2%
54
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Hall, ranked by DC Readiness.

Sites near OZ Hall
SiteTypeVoltageCapacityQueue waitScore
CROSSSubstation-Adjacent345 kV600 MW3.5 yrs60.5
UNKNOWN308204Substation-Adjacent69 kV50 MW3.5 yrs53.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for OZ Hall, Hall is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.