EC Near Guadalupe Generating Station

Greenfield

Guadalupe County, Texas · ERCOT

DC Readiness
57.5
Good / 100

EC Near Guadalupe Generating Station is a greenfield datacenter candidate site in Guadalupe County, Texas, interconnecting through ERCOT. It screens at 57.5/100 DC Readiness and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionERCOT
Queue depth876
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPLumen San Antonio 1
IXP distance20.8 mi
Fiber providers6
Fiber coverage56.7%
Nearest cloud providerAzure
Nearest cloud regionsouthcentralus
Cloud region distance28.5 mi

Site characteristics

Site typeGreenfield
Parcel ownerBLUEBONNET ELECTRIC COOP, INC
Land owner typeprivate
Buildability80.0/100
Land cover (NLCD)Grassland/Herbaceous
Former usenear retired gas plant (5km)

Risk & environment

Flood zoneZone X
Water stress (WRI)2.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score45/100
Construction cost index103.6 (avg 100)

Location context

Nearest datacenterLumen San Antonio 1
DC distance20.8 mi
Nearest rail3.2 mi
Nearest gas pipeline0.4 mi
Nearest fiber route154.6 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.16¢/kWh
Industrial electricity7.49¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$5,941

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
59
Fiber connectivity12%
72
Energy cost10%
91
Water risk8%
44
Natural hazard8%
45
Buildability7%
80
Labor market4%
50
DC cluster4%
75
Land / acreage3%
46
Construction cost3%
64
Gas pipeline2%
99
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Guadalupe County, ranked by DC Readiness.

Sites near EC Near Guadalupe Generating Station
SiteTypeVoltageCapacityQueue waitScore
Guadalupe Generating StationBrownfield320 MW72.6
MARIONSubstation-Adjacent345 kV600 MW3.4 yrs72.4
ELM CREEKSubstation-Adjacent345 kV600 MW3.4 yrs71.2
CLEAR SPRINGSSubstation-Adjacent345 kV600 MW3.4 yrs71.1
RIO NOGALES SWITCHYARDSubstation-Adjacent345 kV600 MW3.4 yrs70.8
ZORNSubstation-Adjacent345 kV600 MW3.4 yrs70.0
CIBOLOSubstation-Adjacent138 kV100 MW3.4 yrs67.5
SCHUMANSVILLESubstation-Adjacent138 kV100 MW3.4 yrs66.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Guadalupe Generating Station, Guadalupe County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.