RIO NOGALES SWITCHYARD

Substation-Adjacent

Guadalupe County, Texas · ERCOT

DC Readiness
58.2
Good / 100

RIO NOGALES SWITCHYARD is a substation-adjacent datacenter candidate site in Guadalupe County, Texas, interconnecting through ERCOT. It screens at 58.2/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationRIO NOGALES SWITCHYARD
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW

Speed to power

ISO / RTO regionERCOT
Queue depth8
Avg queue wait1.7 yrs

Connectivity

Nearest IXPLumen San Antonio 1
IXP distance26.3 mi
Fiber providers10
Fiber coverage67.9%

Site characteristics

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score45/100

Location context

Nearest datacenterLumen San Antonio 1
DC distance26.3 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.16¢/kWh
Industrial electricity7.49¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$5,941

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power15%
63
Fiber connectivity12%
45
Energy cost10%
50
Water risk8%
44
Natural hazard8%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Guadalupe County, ranked by DC Readiness.

Sites near RIO NOGALES SWITCHYARD
SiteTypeVoltageCapacityQueue waitScore
MARIONSubstation-Adjacent345 kV600 MW1.7 yrs61.2
EC Near Guadalupe Generating StationGreenfield3.4 yrs60.7
EC Near Guadalupe Generating StationGreenfield3.4 yrs59.7
EC Near Guadalupe Generating StationGreenfield3.4 yrs59.5
ELM CREEKSubstation-Adjacent345 kV600 MW1.7 yrs58.8
CLEAR SPRINGSSubstation-Adjacent345 kV600 MW1.7 yrs58.4
EC Near Guadalupe Generating StationGreenfield3.4 yrs58.4
EC Near Guadalupe Generating StationGreenfield3.4 yrs57.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.