Sunrise Addition

Industrial

Spink, South Dakota · SPP

DC Readiness
42.1
Fair / 100

Sunrise Addition is a industrial datacenter candidate site in Spink, South Dakota, interconnecting through SPP. It screens at 42.1/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSPP
Queue depth17

Connectivity

Nearest IXPELN02
IXP distance78.6 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterApplied Digital / Ellendale Data Center
DC distance78.7 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (no_income_tax)
Commercial electricity9.87¢/kWh
Industrial electricity8.32¢/kWh
Cooling degree days700
Heating degree days7,300
Land price / acre$4,245

Incentive detail: No state corporate income tax; no personal income tax; no personal property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
43
Fiber connectivity12%
54
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Spink, ranked by DC Readiness.

Sites near Sunrise Addition
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN131113Substation-Adjacent115 kV100 MW1.0 yrs68.1
UNKNOWN131125Substation-Adjacent115 kV100 MW1.0 yrs64.1
EC Near RedfieldGreenfield1.0 yrs62.1
Greenfield (UNKNOWN131103 - UNKNOWN131125)Greenfield115 kV100 MW1.0 yrs61.1
EC Near RedfieldGreenfield1.0 yrs60.4
EC Near RedfieldGreenfield1.0 yrs60.4
RedfieldBrownfield4 MW1.0 yrs60.3
EC Near RedfieldGreenfield1.0 yrs60.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.