Skip to content
Gridcensus

Datacenter Sites in Spink, South Dakota

Spink has 31 scored datacenter candidate sites averaging 58.1/100 DC Readiness, with a catalogued aggregate of 1,204 MW. FEMA rates local natural-hazard risk as "Relatively Low". The county has a datacenter tax incentive on record.

31
Candidate sites
58.1/100
Avg DC Readiness
1,204 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Spink

Site-selection context for Spink

Yesno_income_tax
Datacenter tax incentive
9.87¢/kWh
Commercial electricity
8.32¢/kWh
Industrial electricity
6
Fiber providers
Low-Medium
Water stress
$4,245
Land price / acre
700
Cooling degree days
7,300
Heating degree days
45°F
Mean annual temp

Incentive detail: No state corporate income tax; no personal income tax; no personal property tax.

By site type

Top datacenter sites in Spink

Top datacenter sites in Spink
SiteTypeVoltageCapacityQueue waitScore
EC Near RedfieldGreenfield1.0 yrs65.1
EC Near RedfieldGreenfield1.0 yrs63.4
EC Near RedfieldGreenfield1.0 yrs63.3
EC Near RedfieldGreenfield1.0 yrs63.3
EC Near RedfieldGreenfield1.0 yrs63.1
EC Near RedfieldGreenfield1.0 yrs62.9
EC Near RedfieldGreenfield1.0 yrs62.9
EC Near RedfieldGreenfield1.0 yrs62.5
EC Near RedfieldGreenfield1.0 yrs62.5
EC Near RedfieldGreenfield1.0 yrs62.4
EC Near RedfieldGreenfield1.0 yrs62.2
RedfieldBrownfield4 MW1.0 yrs61.9
EC Near RedfieldGreenfield1.0 yrs59.4
UNKNOWN131113Substation-Adjacent115 kV100 MW3.3 yrs56.6
UNKNOWN131125Substation-Adjacent115 kV100 MW3.3 yrs56.6
UNKNOWN159583Substation-Adjacent69 kV50 MW3.3 yrs55.4
UNKNOWN159521Substation-Adjacent69 kV50 MW3.3 yrs54.6
TAP159523Substation-Adjacent69 kV50 MW3.3 yrs54.6
UNKNOWN159494Substation-Adjacent69 kV50 MW3.3 yrs54.6
TAP159524Substation-Adjacent69 kV50 MW3.3 yrs54.6
UNKNOWN161861Substation-Adjacent69 kV50 MW3.3 yrs54.6
TAP159599Substation-Adjacent69 kV50 MW3.3 yrs54.6
UNKNOWN159656Substation-Adjacent69 kV50 MW3.3 yrs54.6
TAP159522Substation-Adjacent69 kV50 MW3.3 yrs54.6
TAP159581Substation-Adjacent69 kV50 MW3.3 yrs54.6

Spink datacenter FAQ

How many datacenter sites are in Spink?
31 scored datacenter candidate sites, averaging 58.1/100 DC Readiness.
Does Spink offer datacenter tax incentives?
No state corporate income tax; no personal income tax; no personal property tax.
What is the natural-hazard risk in Spink?
FEMA's National Risk Index rates Spink as "Relatively Low" (score 22).
What are industrial electricity rates in Spink?
Average industrial electricity is 8.32¢/kWh and commercial is 9.87¢/kWh in Spink.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Spink, South Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.