Datacenter Sites in Spink, South Dakota
Spink has 34 scored datacenter candidate sites averaging 57.6/100 DC Readiness, with a catalogued aggregate of 904 MW. FEMA rates local natural-hazard risk as "Relatively Low". The county has a datacenter tax incentive on record.
34
Candidate sites
57.6/100
Avg DC Readiness
904 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
Site-selection context for Spink
Yesno_income_tax
Datacenter tax incentive
9.87¢/kWh
Commercial electricity
8.32¢/kWh
Industrial electricity
6
Fiber providers
Low-Medium
Water stress
$4,245
Land price / acre
700
Cooling degree days
7,300
Heating degree days
45°F
Mean annual temp
Incentive detail: No state corporate income tax; no personal income tax; no personal property tax.
By site type
Top datacenter sites in Spink
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Near Redfield | Greenfield | — | — | 1.0 yrs | 65.3 |
| EC Near Redfield | Greenfield | — | — | 1.0 yrs | 63.6 |
| EC Near Redfield | Greenfield | — | — | 1.0 yrs | 63.6 |
| EC Near Redfield | Greenfield | — | — | 1.0 yrs | 63.5 |
| EC Near Redfield | Greenfield | — | — | 1.0 yrs | 63.3 |
| EC Near Redfield | Greenfield | — | — | 1.0 yrs | 63.1 |
| EC Near Redfield | Greenfield | — | — | 1.0 yrs | 63.1 |
| EC Near Redfield | Greenfield | — | — | 1.0 yrs | 62.7 |
| EC Near Redfield | Greenfield | — | — | 1.0 yrs | 62.7 |
| EC Near Redfield | Greenfield | — | — | 1.0 yrs | 62.6 |
| EC Near Redfield | Greenfield | — | — | 1.0 yrs | 62.4 |
| Redfield | Brownfield | — | 4 MW | 1.0 yrs | 62.0 |
| UNKNOWN131113 | Substation-Adjacent | 115 kV | 100 MW | 3.3 yrs | 60.4 |
| UNKNOWN131125 | Substation-Adjacent | 115 kV | 100 MW | 3.3 yrs | 59.7 |
| EC Near Redfield | Greenfield | — | — | 1.0 yrs | 59.6 |
| UNKNOWN159583 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 59.2 |
| TAP159581 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 58.4 |
| TAP159528 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 58.3 |
| TAP159599 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 58.3 |
| UNKNOWN159494 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 58.1 |
| TAP159523 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 58.0 |
| TAP159524 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 58.0 |
| TAP159525 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 58.0 |
| TAP159522 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 57.8 |
| UNKNOWN159521 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 57.7 |
Spink datacenter FAQ
- How many datacenter sites are in Spink?
- 34 scored datacenter candidate sites, averaging 57.6/100 DC Readiness.
- Does Spink offer datacenter tax incentives?
- No state corporate income tax; no personal income tax; no personal property tax.
- What is the natural-hazard risk in Spink?
- FEMA's National Risk Index rates Spink as "Relatively Low" (score 22).
- What are industrial electricity rates in Spink?
- Average industrial electricity is 8.32¢/kWh and commercial is 9.87¢/kWh in Spink.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Spink, South Dakota. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.