Pontiac Mills (Pontiac Enterprices)
IndustrialKent County, Rhode Island · ISO-NE
Pontiac Mills (Pontiac Enterprices) is an industrial datacenter candidate site in Kent County, Rhode Island, interconnecting through ISO-NE. It screens at 54.7/100 DC Readiness and a 3.9 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Kent County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| KENT COUNTY | Substation-Adjacent | 345 kV | 600 MW | 3.9 yrs | 65.7 |
| Kilvert Street Solar | Brownfield | — | 6 MW | 3.9 yrs | 64.6 |
| Beacon Solar Project | Brownfield | 115 kV | 4 MW | 3.9 yrs | 62.4 |
| Central Power Plant | Brownfield | — | 2 MW | 3.5 yrs | 60.3 |
| BLACKBURN SWITCHING STATION | Substation-Adjacent | 115 kV | 100 MW | 3.9 yrs | 60.2 |
| UNKNOWN130071 | Substation-Adjacent | 115 kV | 100 MW | 3.9 yrs | 60.2 |
| UNKNOWN130752 | Substation-Adjacent | 115 kV | 100 MW | 3.9 yrs | 60.1 |
| DRUMROCK | Substation-Adjacent | 115 kV | 100 MW | 3.9 yrs | 59.6 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.