Skip to content
Gridcensus

UNKNOWN203409

Substation-Adjacent

Washington County, Oregon · WECC

DC Readiness
65.5
Good / 100

UNKNOWN203409 is a substation-adjacent datacenter candidate site in Washington County, Oregon, interconnecting through WECC. It screens at 65.5/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN203409
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPTGRDORXA - Tigard Central Office
IXP distance3.2 mi
Fiber providers13
Fiber coverage81.2%

Site characteristics

Risk & environment

Flood zoneZone X
Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterTGRDORXA - Tigard Central Office
DC distance3.2 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity7.96¢/kWh
Industrial electricity5.17¢/kWh
Cooling degree days300
Heating degree days4,700
Land price / acre$22,445

Incentive detail: Enterprise Zone property tax exemption for 3-15 years; no sales tax in Oregon.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
42
Fiber connectivity12%
91
Energy cost10%
50
Water risk8%
60
Natural hazard8%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Washington County, ranked by DC Readiness.

Sites near UNKNOWN203409
SiteTypeVoltageCapacityQueue waitScore
KEELERSubstation-Adjacent500 kV1,000 MW6.9 yrs71.3
PEARLSubstation-Adjacent500 kV1,000 MW6.9 yrs70.0
HORIZONSubstation-Adjacent230 kV300 MW6.9 yrs66.9
SAINT MARYSSubstation-Adjacent230 kV300 MW6.9 yrs66.6
TAP203160Substation-Adjacent230 kV300 MW6.9 yrs65.1
RIVERGATESubstation-Adjacent230 kV300 MW6.9 yrs64.8
TAP207186Substation-Adjacent230 kV300 MW6.9 yrs63.6
TEKTRONIXSubstation-Adjacent138 kV100 MW6.9 yrs62.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN203409, Washington County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.