Greenfield (TYGH VALLEY - ABBOT)

Greenfield

Wasco County, Oregon · WECC

DC Readiness
50.0
Fair / 100

Greenfield (TYGH VALLEY - ABBOT) is a greenfield datacenter candidate site in Wasco County, Oregon, interconnecting through WECC. It screens at 50.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTYGH VALLEY
Substation voltage115 kV
Available capacity100 MW
UtilityWASCO ELECTRIC COOP, INCnot available

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPGRHMORXB - Gresham Central Office
IXP distance60.2 mi
Fiber providers8
Fiber coverage50.4%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterGoogle The Dalles DC
DC distance32.9 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity4.94¢/kWh
Industrial electricity7.32¢/kWh
Cooling degree days300
Heating degree days4,700
Land price / acre$1,809

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone property tax exemption for 3-15 years; no sales tax in Oregon.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (TYGH VALLEY - ABBOT)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
28
Speed to power20%
56
Fiber connectivity12%
58
Energy cost10%
50
Water risk7%
60
Natural hazard6%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Wasco County, ranked by DC Readiness.

Sites near Greenfield (TYGH VALLEY - ABBOT)
SiteTypeVoltageCapacityQueue waitScore
BUCKLEYSubstation-Adjacent500 kV1,000 MW6.9 yrs66.0
MAUPINSubstation-Adjacent230 kV300 MW6.9 yrs62.0
DEAD HEADSubstation-Adjacent230 kV300 MW6.9 yrs60.6
TAP209079Substation-Adjacent115 kV100 MW6.9 yrs58.0
TYGH VALLEYSubstation-Adjacent115 kV100 MW6.9 yrs57.8
TAP205753Substation-Adjacent115 kV100 MW6.9 yrs57.8
UNKNOWN205752Substation-Adjacent115 kV100 MW6.9 yrs57.7
ANTELOPESubstation-Adjacent115 kV100 MW6.9 yrs55.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (TYGH VALLEY - ABBOT), Wasco County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.