Skip to content
Gridcensus

UMATILLA PROJECT

Federal Excess

Umatilla County, Oregon · WECC

DC Readiness
52.6
Fair / 100

UMATILLA PROJECT is a federal excess datacenter candidate site in Umatilla County, Oregon, interconnecting through WECC. It screens at 52.6/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

UtilityUMATILLA ELECTRIC COOP ASSNcooperativemoderate to large load · state default

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait3.5 yrs
Recent queue wait5.5 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPKNWCWAXA - Kennewick Central Office
IXP distance23.5 mi
Fiber providers11
Fiber coverage54.9%

Site characteristics

Acreage80 ac
Buildable load (est.)~32–80 MWland-based
Former useReclamation and Irrigation

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone D
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterAmazon Web Services
DC distance4.4 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity7.77¢/kWh
Industrial electricity6.71¢/kWh
Cooling degree days300
Heating degree days4,700
Land price / acre$2,437

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone property tax exemption for 3-15 years; no sales tax in Oregon.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UMATILLA PROJECT

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
50
Fiber connectivity12%
72
Energy cost10%
50
Water risk7%
60
Natural hazard6%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
60
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Umatilla County, ranked by DC Readiness.

Sites near UMATILLA PROJECT
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN203430Substation-Adjacent230 kV300 MW3.5 yrs62.7
ROUNDUPSubstation-Adjacent230 kV300 MW3.5 yrs60.9
UNKNOWN202431Substation-Adjacent230 kV300 MW3.5 yrs60.5
OZ UmatillaGreenfield——3.5 yrs58.8
FEEDVILLESubstation-Adjacent115 kV100 MW3.5 yrs58.5
TAP205711Substation-Adjacent115 kV100 MW3.5 yrs58.4
TAP205708Substation-Adjacent115 kV100 MW3.5 yrs57.9
TAP205707Substation-Adjacent115 kV100 MW3.5 yrs57.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UMATILLA PROJECT, Umatilla County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.